Contract No: HK/2011/07 Wanchai
Development Phase II and Sampling, Field
Measurement and Testing Works (Stage 2) Environmental Permit no. EP-356/2009, Further Evironmental
permit nos. fep-02/356/2009, FEP-03/356/2009, Fep-04/356/2009 ,Fep-05/356/2009
AND Fep-06/356/2009 Monthly Environmental Monitoring & Audit Report
- APRIL 2013 -
|
CLIENTS: |
|
Civil Engineering and
Development Department and Highways Department |
Lam Geotechnics Limited 11/F Centre Point Wanchai, H.K. Telephone:
(852) 2882-3939 Facsimile:
(852) 2882-3331 E-mail:
info@lamenviro.com Website:
http://www.lamenviro.com |
|
|
|
|
|
Certified
by: |
|
Raymond
Dai Environmental
Team Leader |
|
DATE: |
|
May 2013 |
2.2 Scope of the Project and Site Description
2.3 Division of the Project Responsibility
2.4 Project Organization and Contact Personnel
3. Status of Regulatory Compliance
3.1 Status of Environmental Licensing and Permitting under
the Project
5.2 Real-time Noise Monitoring
6.2 Real-time noise Monitoring
6.5 Review of the Reasons for and the Implications of
Non-compliance
6.6 Summary of action taken in the event of and follow-up
on non-compliance
7. Cumulative Construction Impact due to the Concurrent
Projects
9. Complaints, Notification of Summons and Prosecution
lIST OF TABLES
Table I Summary of Water Quality Monitoring Exceedances in
Reporting Month
Table II Summary of Enhanced Dissolved Oxygen Monitoring
Exceedances in Reporting Month
Table 2.1 Schedule 2 Designated Projects under this Project
Table 2.2 Details of Individual Contracts under the Project
Table 2.3 Contact Details of Key Personnel
Table 3.4 Cumulative Summary of Valid Licences and Permits under
Contract no. HK/2009/01
Table 3.5 Summary of submission status under FEP-02/356/2009
Condition
Table 3.6 Cumulative Summary of Valid Licences and Permits under
Contract no. HK/2009/02
Table 3.7 Summary of submission status under FEP-03/356/2009
Condition
Table 3.8 Cumulative Summary of Valid Licences and Permits under
Contract no. HY/2009/15
Table 3.9 Summary of submission status under FEP-04/356/2009
Condition
Table 3.10 Cumulative Summary of Valid Licences and Permits under
Contract no. HK/2010/06
Table 3.11 Summary of submission status under EP-356/2009 and
FEP-05/356/2009 Condition
Table 3.12 Cumulative Summary of Valid Licences and Permits under
Contract no. HY/2009/19
Table 3.13 Cumulative Summary of Valid
Licences and Permits under Contract no. HK/2012/08
Table 3.14 Summary of submission status under EP-356/2009 and FEP-06/356/2009 Condition
Table 4.1 Noise Monitoring Station
Table 4.2 Real Time Noise Monitoring Station
Table 4.3 Air Monitoring Station
Table 4.4 Marine Water Quality Stations for Water Quality
Monitoring
Table 4.5 Marine Water Quality Monitoring Frequency and
Parameters
Table 4.6 Marine Water Quality Stations for Enhanced Water
Quality Monitoring
Table 4.7 Marine Water Quality Stations for Additional DO
Monitoring
Table 5.2 Noise Monitoring Station for Contract nos. HK/2009/01,
HK/2009/02 and HK/2010/06
Table 5.3 Noise Monitoring Station for Contract no. HY/2009/15
Table 5.4 Noise Monitoring Station for Contract no. HY/2009/19
Table 5.5 Real Time Noise Monitoring Station for Contract no.
HY/2009/19
Table
5.7 Air Monitoring Station for Contract no.
HK/2009/01
Table 5.8 Air Monitoring Station for Contract no. HK/2009/02
Table 5.9 Air Monitoring Station for Contract no. HY/2009/15
Table 5.10 Air
Monitoring Stations for Contract no. HY/2009/19
Table 5.11 Water Monitoring Stations for contracts
with respect to remaining DP3
work areas after the completion of
DP5 & DP6 in 2012 and intake diversion in 2013
Table 5.12 Water
Monitoring Stations for Contract no. HK/2009/01
Table 5.13 Water
Monitoring Stations for Contract no. HK/2009/02
Table 5.14 Water
Monitoring Stations for Contract no. HK/2010/06
Table 5.15 Water
Monitoring Stations for Contract no. HY/2009/15
Table 5.16 Water
Monitoring Stations for Contract no. HY/2009/19
Table 5.17 Summary
of Water Quality Monitoring Exceedances in Reporting Month
Table 5.18 Summary
of Enhanced Dissolved Oxygen Monitoring Exceedances in Reporting Month
Table 5.19 Details of Waste Disposal for Contract no. HK/2009/01
Table 5.20 Details of Waste Disposal for Contract no. HK/2009/02
Table 5.21 Details of Waste Disposal for Contract no. HY/2009/15
Table 5.22 Details of Waste Disposal for Contract no. HK/2010/06
Table 5.23 Details
of Waste Disposal for Contract no. HY/2009/19
Table 8.1 Summary
of Environmental Inspections for Contract no. HK/2009/01
Table 8.2 Summary
of Environmental Inspections for Contract no. HK/2009/02
Table 8.3 Summary
of Environmental Inspections for Contract no. HY/2009/15
Table 8.4 Summary
of Environmental Inspections for Contract no. HK/2010/06
Table 9.1 Cumulative Statistics on Complaints
Table 9.2 Cumulative Statistics on Successful Prosecutions
Table 10.1 Construction Activities and Recommended Mitigation
Measures in Coming Reporting Month
lIST OF FIGUREs
Figure 2.2 Project Organization Chart
Figure 2.3 Locations of Environmental Monitoring Stations
lIST OF APPENDIces
Appendix 3.1 Environmental Mitigation Implementation Schedule
Appendix 4.1 Action and Limit Level
Appendix 4.2 Copies of Calibration Certificates
Appendix 5.1 Monitoring Schedule for Reporting Month and Coming month
Appendix 5.2 Noise Monitoring Results and Graphical Presentations
Appendix 5.3 Air Quality Monitoring Results and Graphical Presentations
Appendix 5.4 Water Quality Monitoring Results and Graphical Presentations
Appendix 5.4a Additional Dissolved Oxygen Monitoring Results
Appendix 5.5 Real-time Noise Monitoring Results and Graphical Presentations
Appendix 6.1 Event Action Plans
Appendix
6.2 Summary for Notification of
Exceedance
Appendix 8.1 Construction Programme of Individual Contracts
Construction Activities for the Reported Period
Marine Works (at Wan Chai)
¡P
Rockfilling at the northern part of HKCEC3E (East
of HKCEC) between CH290 and CH385.
¡P
Installation of shoring for temporary open channel
between CH290 and CH385.
¡P
Construction of mass concrete coping for new
seawall.
¡P
Installation of ELS for construction of proposed
box culvert Bay 8 and Bay 9.
Cross-Harbour Watermains
Installation (CHA & CHB) and Marine Works (at TST)
¡P
Grade 75 Rockfilling and rock protection to cross-harbour
watermains.
¡P
Installation of interim connecting pipe between
existing main and the proposed pipeline at
¡P
CCTV inspection for cross-harbour water main
(including CHA, CHB, CHE & CHF) .
¡P
Installation of interim connecting pipe between
existing main and the proposed pipeline at
¡P
Installation of interim connecting pipe between
land main and submarine pipeline at Zone B1-5A.
¡P
¡P
Pre-handover and final handover by WSD .
¡P
HEC and PCCW cabling works in Zone A1-1 which
connected to the proposed transformer rectifier at new reclaimed area.
Fresh Watermains, Cooling
Watermains and Salt Watermains (On Land)
¡P
Mainlaying works at Zone B6-1B, B6-2A, B6-4, B6-5B,
A2-3A, A1-5C, A3-3C, C1-2 and X2-1.
¡P
Washout pit construction in Zone A2-3A and A3-2B
and Reinstatement works in Zone A3-2B.
¡P
TTA at Zone A1-5C at
¡P
Mainlaying works at Zone C1-2 and X2-1.
¡P
Mainlaying works in Zone B6-4 and B6-5B.
¡P
Mainlaying works in Zone B6-1B and B6-2A.
¡P
Connection works for 2nd Intake pipe of Convention
Plaza (CP).
¡P
Trench excavation in Zone X2-1 of
Tunnel Works
¡P
Pre-drilling works for CWB (Stage 2).
¡P
Diaphragm wall construction works at Stage 2
(North). The remaining Diaphragm wall would be carried out after mobilization
of Trench Cutter on site.
¡P
Temporary bulkhead wall construction works between
Stage1 / Stage2.
¡P
Trench cutter was mobilized to Site.
¡P
Pre-bored H piling works for CWB (Stage1b).
¡P
2nd Piling rig for pre-bored H piling works under
atrium was mobilized to Site.
E & M
¡P
Full commissioning test for Cooling Water Pumping
Station P3.
¡P
Handover inspection for Cooling Water Pumping
Station P1.
¡P
Handover inspection for Cooling Water Pumping
Station P4.
¡P
Full commissioning test for Cooling Water Pumping
Station P5.
Application of Epoxy Lining
to Existing Box Culvert M (VO No.31)
¡P
Epoxy lining application to the eastern box of the
existing Box Culvert M.
¡P
Epoxy lining application to the western box of the
existing Box Culvert M.
¡P
Modification work of PTI at
¡P
Modification of existing covered walkway along
¡P
Pressure tests for both intake main of GE/HC and
SHK in the whole WCR1 area.
¡P
Remedial works for P7, P8. Mini pile foundation to
support the rectified pipeworks.
¡P
Major E&M works and their T&C in Cooling
Water Pumping Stations P7, P8 and P9.
¡P
Footpath reinstatement for the trenches near
Harbour Centre.
¡P
Dry tests at WSD Salt Water Pumping Station. Wet test after completion of the
proposed intake culvert.
¡P
Drilling hole and installation of pipe bracket for
aeration and chlorination pipe inside salt water intake culvert between Bay 4
and Bay 11 (except Bay 7) .
¡P
Installation of stoplog at Bay
¡P
Remedial works for concrete plug at Bay 1B.
¡P
Mainlaying works for DN800 salt watermains (CHS
¡P
Backfilling works of Bay19B at the junction between
¡P
The ABWF works in WSD Salt Water Pumping Station,
including maintenance platform and external finishes.
¡P
The whole sewage outfall system under Section VI
was handed over to DSD.
¡P
Backfilling for the receiving pit adjacent to WCE
PTW at
¡P
Re-construction for the DSD Pumping Station
boundary wall at
¡P
The manhole for 1050 dia. concrete pipe between Bay
1 and the existing drainage.
¡P
Installation of concrete block and plastering works
wall for toilet over PT2 & PT3 at Level 1 (+4.15mPD).
¡P
Concreting of base slab and stem wall for PT4 &
PT5 at Level 1 (+4.15mPD) and top-slab.
¡P
Installation of Steel frame on Observation Deck.
¡P
Formwork erection for the late cast roof slab.
¡P
Concreting of western concrete staircase to Level 2;
and its construction to Observation Deck Level.
¡P
Concreting of base slab and stem wall for PT1 at
Level 1 (+4.15mPD).
¡P
Concreting of
¡P
Installation of bracket and railing for the
proposed movable ramp system.
¡P
Planter wall and parapet wall construction at Level
2 and Observation Deck.
¡P
ABWF including brickworks and E&M cable tray at
1/F, 2/F and M/F.
¡P
Dredging of TWCR4 dredging works.
¡P
Removal of eastern breakwater of CBTS
¡P
Installation of temporary wave protection barrier
at eastern breakwater
¡P
Sheet Piling Works
¡P
Utility Diversion Works
¡P
Road surfacing preparatory works
¡P
Precast Unit Box Installation Preparation Works
(mainland
¡P
D-wall and Barrette Construction
¡P
Construction works for Box Culvert T1
¡P
Construct ion of socket-H pile
¡P
Construction works for Culvert U1
¡P
Dismantling of marine platform
¡P
Demolition of parapet at IEC Link
¡P
Construction of Pile caps & columns (Marine)
¡P
Construction of dewatering well for Cut & Cover
Tunnel
¡P
D8-D9 Gantry Fabrication for precast segment
¡P
ELS for Cut & Cover Tunnel
¡P
Laying of 1500f pipe
¡P
Site preparation works
¡P
Site survey
Noise
Monitoring
M3a: from 11 April 2013 to 12 April 2013
M4b: from 11 April 2013 to 12 April 2013
M5b: from 2 April 2013 to 3 April 2013 and from 11
April 2013 and 12 April 2013
M6: from 2 April 2013 to 3 April 2013 and from
11pril 2013 and 12 April 2013
Real-time
Noise Monitoring
Air Quality Monitoring
Rescheduled,
CMA1b: from 19 Apr 2013 to 20 Apr 2013
CMA3a: from 8 Apr 2013 to 9 Apr 2013 and from 25 Apr
2013 to 26 Apr 2013
Water Quality Monitoring
Table
I Summary of Water Quality
Monitoring Exceedances in Reporting Month
Water Monitoring Station |
Mid-flood |
Mid-ebb |
||||||||||||
DO |
Turbidity |
SS |
DO |
Turbidity |
SS |
|||||||||
|
LL |
|
LL |
|
LL |
|
LL |
|
LL |
|
LL |
|||
HK/2009/01 |
WSD19 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
3 |
1 |
2 |
|
|
C1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
C3 |
0 |
5 |
0 |
0 |
0 |
0 |
0 |
5 |
0 |
0 |
0 |
0 |
|
|
C4e |
0 |
5 |
0 |
0 |
1 |
0 |
0 |
4 |
0 |
1 |
0 |
0 |
|
|
C4w |
1 |
3 |
0 |
0 |
1 |
0 |
1 |
4 |
0 |
0 |
0 |
0 |
|
|
P1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
P3 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
P4 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
P5 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
Monitoring
finished on 27 April 2012 |
WSD20 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
WSD7 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
HK/2009/01 & HK/2010/06 |
C2 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
HK/2009/02 |
C5e |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
C5w |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
Monitoring started
on 8 Feb 2012 |
WSD21 |
0 |
0 |
0 |
0 |
2 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
WSD9 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
|
WSD17 |
0 |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
HY/2009/15 |
C7 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
HY/2009/19 Monitoring started on 28 Jan 2012 |
C8 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
C9 |
0 |
0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
Total |
1 |
13 |
1 |
0 |
5 |
0 |
1 |
13 |
1 |
4 |
1 |
2 |
||
- WSD9 and WSD17 were implemented with respect to HK/2009/02 from 8 Feb 2012.
- 4-week water quality monitoring at
WSD9, WSD10, WSD15, WSD17, C8 and C9 were completed on 6 Feb 2012.
- C8 and C9 were implemented with
respect to HY/2009/19 from 28 Jan 2012.
- C8 & C9 was temporary
suspended on 30 March 2013 due to the marine works for Contract no. HY/2009/19
had been completed on 4 March 2013
- WSD7 and WSD20 water quality
monitoring were temporarily suspended from 27 Apr 2012.
Table
II Summary of Enhanced Dissolved
Oxygen Monitoring Exceedances in Reporting Month
Contract no. |
Water Monitoring Station |
Mid-flood |
Mid-ebb |
||
DO |
DO |
||||
|
LL |
|
LL |
||
C6 |
0 |
0 |
0 |
0 |
|
C7 |
0 |
0 |
0 |
0 |
|
Ex-WPCWA SW |
0 |
0 |
1 |
1 |
|
Ex-WPCWA SE |
0 |
0 |
2 |
0 |
|
Total |
0 |
0 |
3 |
1 |
Complaints, Notifications of Summons and Successful
Prosecutions
Site Inspections and Audit
Contract no. HK/2009/01 - Wan Chai Development
Phase II ¡V Central ¡VWanchai Bypass at HKCEC
Marine Works
¡P
Filling works up to +4.0mPD.
¡P
Steel bridge construction over temporary open channel
between CH220 and CH260.
¡P
Construction of mass concrete coping for new
seawall.
¡P
Installation of ELS for construction of proposed
box culvert Bay 8 and Bay 9. Subsequent Box Culvert construction for Bay 8
& 9.
¡P
Backfilling to temporary water channel for
subsequent demolition of promenade deck and pumping station at HKCEC Water
Channel.
¡P
Connection works of Pipeline D to exiting mains at
Wan Chai.
¡P
Connection works of Pipeline C to exiting mains at
Wan Chai.
Fresh Watermains, Cooling
Watermains and Salt Watermains (On Land)
¡P
Works at Zone B6-1B, B6-2A, B6-4, B6-5B, A2-3A,
A1-5C, A3-3C, C1-2 and X2-1.
¡P
Mainlaying works at Zone A2-3A and A1-5C.
¡P
Mainlaying works in Zone C1-2.
¡P
Mainlaying works for proposed sewerage system in
Zone B6-1B, B6-2A, B6-4.
¡P
Mainlaying works at Zone X2-1.
¡P
Tunnel Works
¡P
Installation of pre-bored H-pile in CWB Stage 1B
under the atrium link (from Ch80 to Ch220).
¡P
Installation of pre-bored H-pile in CWB Stage 1B
under the atrium link (from Ch120 to Ch220).
¡P
3rd Piling rig for pre-bored H piling works under
atrium would be mobilized to Site.
¡P
CWB diaphragm wall construction under the atrium
lin.
¡P
Construction of bulkhead Wall at Ch120.
¡P
Pre-drilling works for CWB (Stage 3).
¡P
Demolition of the promenade deck and pumping stations
at HKCEC Water Channel.
E&M Works
¡P
Full commissioning for Cooling Water Pumping
Station P5.
¡P
Handover inspection for Cooling Water Pumping
Station P3.
¡P
Handover inspection for Cooling Water Pumping
Station P5.
Application of Epoxy Lining
to Existing Box Culvert M (VO No.31)
¡P
Epoxy lining application to the western box of the
existing Box Culvert M.
Contract no. HK/2009/02 - Wan Chai Development
Phase II ¡V Central ¡V Wan Chai Bypass at Wan Chai East
¡P
Footpath reinstatement works of cooling mains near
Harbour Centre / Great Eagle Centre.
¡P
Remedial works and subsequent T&C for CRB
intake pipes within WCR1 area. Notification to stakeholder for switching over
for the proposed cooling water intake system.
¡P
Construction of pile caps for rectifying the
subsided intake pipes for both GE/HC and SHK.
¡P
Remaining DN800 salt watermins (CHS
¡P
Construction of remedial works for the concrete
plug at Bay 1B and the subsequent construction of Bay 1B and Bay 2B Intake Culvert.
¡P
All mainlaying works and prepare for connection
with the existing DN600 salt watermains at
¡P
Leakage test for the installed stoplog at Bay
¡P
Synthetic woods and façade works for the external
wall of WSD Salt Water Pumping Station.
¡P
Backfilling to Bay 6 to Bay 11 of Intake Culvert.
¡P
PLC & SCADA functional and performance tests
after completion of training to WSD staff.
¡P
Reinstatement works of DSD receiving pit at
¡P
Construction of Bay 4 & Bay 5 of the proposed
Box Culvert N1.
¡P
ABWF in Ferry Pier.
¡P
Installation of moveable ramp system included the
commencement of ramp installation
¡P
Civil works above the caisson seawall 2X including
staircase ST-1 and the plant room underneath the western staircase.
¡P
Late cast portion for Roof RC Superstructure above
the machine room in Level M.
¡P
Lift installation at Ferry Pier.
Contract no. HY/2009/15 - Central-Wanchai Bypass ¡V
Tunnel (
¡P
Removal of eastern breakwater of CBTS
¡P
Installation of temporary wave protection barrier
at eastern breakwater
¡P
Temporary works for EVA
Contract no. HK/2010/06 - Wan Chai Development
Phase II ¡V Central ¡V Wan Chai Bypass over MTR Tsuen Wan Line
¡P
Sheet Piling Works
¡P
Utility Diversion Works
¡P
Road surfacing works
¡P
Precast Unit Box Installation Preparation Works
(mainland
Contract no. HY/2009/19- Wan Chai Bypass Tunnel
(North Point Section) and Island Eastern Corridor Link
¡P
D-wall and Barrette Construction
¡P
Construction works for Box Culvert T1
¡P
Construction works for Culvert U1
¡P
Construction of Pile cap (Land)
¡P
Demolition of parapet at IEC Link
¡P
Construction of dewatering well for Cut & Cover
Tunnel
¡P
Construction of pile cap, column & cross head
(Marine)
¡P
D8-D9 Gantry Fabrication for precast segment
¡P
ELS for Cut & Cover Tunnel
¡P
Laying of 1500f pipe
Contract
no. HK/2012/08 ¡V Wan Chai Development Phase II ¡V Central- Wan Chai Bypass at Wan
Chai West
¡P
Hoarding
erection
¡P
Marine
GI
1.1.1. Lam
Geotechnics Limited (LGL) has been appointed to work as the Environmental Team
(ET) under Environmental Permit no. EP-356/2009 and Further Environmental
permit nos. FEP-02/356/2009, FEP-03/356/2009, FEP-04/356/2009, FEP-05/356/2009 and
FEP-06/356/2009 to implement the Environmental Monitoring and Audit (EM&A)
programme as stipulated in the EM&A Manual of the approved Environmental
Impact Assessment (EIA) Report for Wan Chai Development phase II and
Central-Wan Chai Bypass (Register No.: AEIAR-125/2008) and in the EM&A
Manual of the approved EIA Report for Central-Wan Chai Bypass and Island
Eastern Corridor Link (Register No. AEIAR-014/2001).
1.1.2. This
report presents the environmental monitoring and auditing work carried out in
accordance to the Section 10.3 of EM&A Manual and ¡§Environmental
Monitoring and Audit Requirements¡¨ under Particular Specification Section
27.
1.1.3. This
report documents the finding of EM&A works for Environmental Permit no.
EP-356/2009, Further Environmental Permit no. FEP-02/356/2009, FEP-03/356/2009,
FEP-04/356/2009 and FEP-05/356/2009 and during the period of March 2013 to April
2013. The cut-off date of reporting is at 27th of each reporting
month.
Section 1 Introduction ¡V details the scope and structure of the report.
Section 2 Project
Background ¡V summarizes background and
scope of the project, site description, project organization and contact
details of key personnel during the reporting period.
Section 3 Status of Regulatory Compliance ¡V summarizes the status of valid Environmental Permits /
Licenses during the reporting period.
Section 4 Monitoring
Requirements ¡V summarizes all monitoring
parameters, monitoring methodology and equipment, monitoring locations,
monitoring frequency, criteria and respective event and action plan and
monitoring programmes.
Section 5 Monitoring
Results ¡V summarizes the monitoring
results obtained in the reporting period.
Section 6 Compliance Audit ¡V summarizes
the auditing of monitoring results, all exceedances environmental
parameters.
Section 7 Cumulative Construction Impact due
to the Concurrent Projects ¡V summarizes the relevant cumulative
construction impact due to the concurrent activities of the concurrent Projects.
Section 8 Site Inspection ¡V summarizes the findings of weekly site inspections
undertaken within the reporting period, with a review of any relevant follow-up actions within the reporting period.
Section 9 Complaints, Notification of
summons and Prosecution ¡V summarizes the cumulative statistics on
complaints, notification of summons and prosecution
Section 10 Conclusion
2.1.1. ¡§Wan Chai
Development phase II and Central-Wan Chai Bypass¡¨ and ¡§Central-Wan Chai Bypass
and Island Eastern Corridor Link¡¨ (hereafter called ¡§the Project¡¨) are Designed
Project (DP) under the Environmental Impact Assessment Ordinance (Cap. 499)
(EIAO). The Environmental Impact Assessment (EIA) Reports for Central-Wan Chai
Bypass and
2.1.2. The key
purpose of Wan Chai Development Phase II (WDII) is to provide land at Wan Chai
North and North Point for construction of the Central-Wan Chai Bypass and
Island Eastern Corridor Link (CWB). Land formed under the project will be
developed as a world-class waterfront promenade joining that at the new Central
waterfront for public enjoyment.
2.1.3. There is a
compelling and present need for the CWB to provide relief to the very congested
2.2.1. The
Project is located mainly in Wan Chai North,
2.2.2. The study
area encompasses existing developments along the Wan Chai,
2.2.3. The scope of the Project comprises:
¡P
Land
formation for key transport infrastructure and facilities, including the Trunk
Road (i.e.
CWB) and the associated slip roads for connection to the Trunk Road and for through
traffic from Central to Wan Chai and Causeway Bay. The land formed for the above
transport infrastructure will provide opportunities for the development of an
attractive waterfront promenade for the enjoyment of the public
¡P
Reprovisioning
/ protection of the existing facilities and structures affected by the land
formation works mentioned above
¡P
Extension,
modification, reprovisioning or protection of existing storm water drainage
outfalls, sewerage outfalls and watermains affected by the revised land use and
land formation works mentioned above
¡P
Upgrading
of hinterland storm water drainage system and sewerage system, which would be
rendered insufficient by the land formation works mentioned above
¡P
Provision
of the ground level roads, flyovers, footbridges, necessary transport
facilities and the associated utility services
¡P
Construction
of the new waterfront promenade, landscape works and the associated utility
services
¡P
The
Trunk Road (i.e. CWB) within the study area and the associated slip roads for
connection to the Trunk Road.
2.2.4. The
project also contains various Schedule 2 DPs that, under the EIAO, require
Environmental Permits (EPs) to be granted by the DEP before they may be either
constructed or operated. Table 2.1 summarises the five individual
DPs under this Project. Figure 2.1 shows the
locations of these Schedule 2 DPs.
Table 2.1 Schedule
2 Designated Projects under this Project
Item |
Designated
Project |
EIAO
Reference |
Reason for
inclusion |
DP1 |
Central-Wanchai Bypass (CWB) including its road tunnel and slip roads |
Schedule 2, Part I, A.1 and A.7 |
Trunk road and road tunnel more than 800 m in length |
DP2 |
Road P2 and other roads which are classified as primary/district
distributor roads |
Schedule 2, Part I, A.1 |
Primary / district distributor roads |
DP3 |
Reclamation works including associated dredging works |
Schedule 2, Part I, C.1 and C.12 |
Reclamation more than 5 ha in size and a dredging operation less than
100 m from a seawater intake point |
DP5 |
Wan Chai East Sewage Outfall |
Schedule 2, Part I, F.5 and F.6 |
Submarine sewage pipelines with a total diameter more than 1,200 mm
and include a submarine sewage outfall |
DP6 |
Dredging for the Cross-harbour Water Mains from Wan Chai to Tsim Sha
Tsui |
Schedule 2, Part I, C.12 |
A dredging operation less than 100 m from a seawater intake point |
2.3.1. Due to the
multi-contract nature of the Project, there are a number of contracts
sub-dividing the whole works area into different work areas to be commenced.
Contractors of individual contracts will be required by the EP holder to apply
Further Environmental Permits (FEP) such that the impact monitoring stations
are sub-divided accordingly to facilitate the implementation of EM&A
programme and to streamline the EM&A reporting for individual FEP holders
correspondingly.
2.3.2. The details
of individual contracts are summarized in Table 2.2.
Table 2.2 Details
of Individual Contracts under the Project
Contract
No. |
Contract Title |
Associated
DP(s) |
Construction
Commencement Date |
HK/2009/01 |
Wan Chai Development Phase II ¡V Central ¡VWanchai Bypass at |
DP3, DP6 |
23 July 2010 |
DP1, DP2 |
25 August 2011 |
||
HK/2009/02 |
Wan Chai Development Phase II ¡V Central ¡V Wan Chai Bypass at WanChai
East |
DP3, DP5 |
5 July 2010 |
DP1 |
26 April 2011 |
||
HY/2009/11 |
Wan Chai Development Phase II and Central ¡V Wan Chai Bypass ¡V North
Point Reclamation |
DP3 |
17 March 2010 |
HY/2009/15 |
Central-Wanchai Bypass ¡V Tunnel ( |
DP3 |
10 November 2010 |
DP1 |
13 July 2011 |
||
HK/2010/06 |
Wan Chai Development Phase II-Central-Wan Chai Bypass over MTR Tsuen
Wan Line |
DP3 |
22 March 2011 |
04/HY/2006 |
Reconstruction of Bus Terminus near |
DP1 |
September 2010 |
HY/2009/17 |
Central - Wan Chai Bypass (CWB) at FEHD Whitfield Depot - Advanced
piling works. |
DP1 |
5 October 2010 |
HY/2009/18 |
Central - Wan Chai Bypass (CWB) ¡V Central Interchange |
DP1 |
21 April 2011 |
HY/2009/19 |
Central - Wanchai Bypass Tunnel (North Point Section) and Island
Eastern Corridor Link |
DP1 |
24 March 2011 |
HK/2012/08 |
Wan Chai Development
Phase IICentral- Wan Chai Bypass at
Wan Chai West |
DP1,DP2,
DP3 |
March 2013 |
2.4.1. Civil
Engineering and Development Department and Highways Department are the overall
project controllers for the Wan Chai Development Phase II and Central-Wan Chai
Bypass respectively. For the construction phase of the Project, Project
Engineer, Contractor(s), Environmental Team and Independent Environmental
Checker are appointed to manage and control environmental issues.
2.4.2. The proposed
project organization and lines of communication with respect to environmental
protection works are shown in Figure 2.2. Key
personnel and contact particulars are summarized in Table 2.3:
Table
2.3 Contact Details of Key Personnel
Party |
Role |
Post |
Name |
Contact
No. |
Contact
Fax |
AECOM |
Engineer¡¦s Representative for WDII |
Principal Resident Engineer |
Mr. Frankie Fan |
2587 1778 |
2587 1877 |
Engineer¡¦s Representative for CWB |
Principal Resident Engineer |
Mr. Peter Poon |
3912 3388 |
3912 3010 |
|
Chun Wo ¡V Leader Joint Venture |
Contractor under Contract no. HK/2009/01 |
Joint
Venture Board Representative |
|
2162 9909 |
2587 1878 |
Site Agent |
Mr. Paul Yu |
9456 9819 |
|||
Deputy Site
Agent |
Mr Andy Yu |
9648 4896 |
|||
Construction
Manager |
Mr Terry
Wong |
9757 9846 |
|||
Construction
Manager |
Mr. Wyman
Wong |
9627 2467 |
|||
Construction
Manager |
Mr. Jack Chu |
9775 3008 |
|||
Environmental
Officer (Compliance Manager) |
Mr. Andy
Mak |
9103 2370 |
|||
Environmental
Supervisor |
Kwong Weng
Kit |
6253 3356 |
|||
Chun Wo ¡V CRGL Joint Venture |
Contractor under Contract no. HK/2009/02 |
Deputy
Project Manager |
Mr. Chan Sing Cho |
3658 3002 |
2827 9996 |
Quality & Environmental Manager |
Mr. C.P. Ho |
9191 8856 |
|||
|
Contractor under Contract no. HY/2009/15 |
Project Director |
Chan Wai Hung |
2823 7813 |
2865 5229 |
Site Manager |
J H Chen |
3557 6368 |
2566 2192 |
||
|
|
Contractor¡¦s Representative |
Andrew Wong |
3557 6358 |
|
|
|
Head of Construction Manager |
Roger Cheung |
3557 6371 |
|
|
|
Senior Construction Manager |
Gene Cheung |
3557 6395 |
|
|
|
Environmental Officer |
Mr. Daniel Sin |
3557 6347 |
|
Gammon -Leader JV |
Contractor under Contract no. HK/2010/06 |
Project
Manager |
Mr. Paul Lui |
9095 7922 |
2529 2880 |
Site Agent |
Mr. Keith Tse |
2529 2068 |
|||
Environmental
Officer |
Clement
Pang |
9735 9200 |
|||
Environmental
Supervisor |
Jacky
Cheung |
9779 2292 |
|||
Chun Wo - CRGL - MBEC Joint Venture |
Contractor under Contract no. HY/2009/19 |
Project Manager |
Mr. Rayland Lee |
3758 8879 |
|
Site Agent |
Paul Yu |
9456 9819 |
|||
Environmental Engineer |
Mr. Calvin Leung |
9286 9208 |
|||
Environmental Manager / Environmental Officer |
Mr. M.H. Isa |
9884 0810 |
|||
Construction Manager (Marine) |
William Luk |
9610 1101 |
|||
Construction Manager (Land) |
Patrick Cheung |
9643 3012 |
|||
Construction Manager (Land) |
Eric Fong |
6191 9337 |
|||
Operation Manager (Land) |
Yung Kwok Wah |
9834 1010 |
|||
Leader JV |
Contractor under Contract no. HK/2012/08 |
Project Director |
Andrew TSE |
9137 1811 |
2877 1522 |
Project Manager |
Victor WU |
9193 8871 |
|||
Deputy Project Manager |
George CHEUNG |
9268 1918 |
|||
Site Agent |
Paul LUI |
9095 7922 |
|||
Environmental Officer |
James MA |
9130 9549 |
|||
Environmental Supervisor |
Ching Man, CHAN |
6050 4919 |
|||
ENVIRON Hong Kong Limited |
Independent
Environmental Checker (IEC) |
Independent Environmental Checker (IEC) |
Mr. David Yeung |
3465 2888 |
3465 2899 |
Lam Geotechnics Limited |
Environmental
Team (ET) |
Environmental Team Leader (ETL) |
Mr. Raymond Dai |
2882 3939 |
2882 3331 |
2.4.3. For
Contract no. HK/2009/01, the principal work activities in this reporting month
included:
Marine Works (at Wan Chai)
¡P
Rockfilling at the northern part of HKCEC3E (East
of HKCEC) between CH290 and CH385.
¡P
Installation of shoring for temporary open channel
between CH290 and CH385.
¡P
Construction of mass concrete coping for new
seawall.
¡P
Installation of ELS for construction of proposed
box culvert Bay 8 and Bay 9.
Cross-Harbour Watermains
Installation (CHA & CHB) and Marine Works (at TST)
¡P
Grade 75 Rockfilling and rock protection to
cross-harbour watermains.
¡P
Installation of interim connecting pipe between
existing main and the proposed pipeline at
¡P
CCTV inspection for cross-harbour water main
(including CHA, CHB, CHE & CHF) .
¡P
Installation of interim connecting pipe between
existing main and the proposed pipeline at
¡P
Installation of interim connecting pipe between
land main and submarine pipeline at Zone B1-5A.
¡P
¡P
Pre-handover and final handover by WSD .
¡P
HEC and PCCW cabling works in Zone A1-1 which connected
to the proposed transformer rectifier at new reclaimed area.
Fresh Watermains, Cooling
Watermains and Salt Watermains (On Land)
¡P
Mainlaying works at Zone B6-1B, B6-2A, B6-4, B6-5B,
A2-3A, A1-5C, A3-3C, C1-2 and X2-1.
¡P
Washout pit construction in Zone A2-3A and A3-2B
and Reinstatement works in Zone A3-2B.
¡P
TTA at Zone A1-5C at
¡P
Mainlaying works at Zone C1-2 and X2-1.
¡P
Mainlaying works in Zone B6-4 and B6-5B.
¡P
Mainlaying works in Zone B6-1B and B6-2A.
¡P
Connection works for 2nd Intake pipe of Convention
Plaza (CP).
¡P
Trench excavation in Zone X2-1 of
Tunnel Works
¡P
Pre-drilling works for CWB (Stage 2).
¡P
Diaphragm wall construction works at Stage 2
(North). The remaining Diaphragm wall would be carried out after mobilization
of Trench Cutter on site.
¡P
Temporary bulkhead wall construction works between
Stage1 / Stage2.
¡P
Trench cutter was mobilized to Site.
¡P
Pre-bored H piling works for CWB (Stage1b).
¡P
2nd Piling rig for pre-bored H piling works under
atrium was mobilized to Site.
E & M
¡P
Full commissioning test for Cooling Water Pumping
Station P3.
¡P
Handover inspection for Cooling Water Pumping
Station P1.
¡P
Handover inspection for Cooling Water Pumping
Station P4.
¡P
Full commissioning test for Cooling Water Pumping
Station P5.
Application of Epoxy Lining
to Existing Box Culvert M (VO No.31)
¡P
Epoxy lining application to the eastern box of the
existing Box Culvert M.
¡P
Epoxy lining application to the western box of the
existing Box Culvert M.
2.4.4. For
Contract no. HK/2009/02, the principal work activities in this reporting month
included:
¡P
Modification work of PTI at
¡P
Modification of existing covered walkway along
¡P
Pressure tests for both intake main of GE/HC and
SHK in the whole WCR1 area.
¡P
Remedial works for P7, P8. Mini pile foundation to
support the rectified pipeworks.
¡P
Major E&M works and their T&C in Cooling
Water Pumping Stations P7, P8 and P9.
¡P
Footpath reinstatement for the trenches near
Harbour Centre.
¡P
Dry tests at WSD Salt Water Pumping Station. Wet test after completion of the
proposed intake culvert.
¡P
Drilling hole and installation of pipe bracket for
aeration and chlorination pipe inside salt water intake culvert between Bay 4
and Bay 11 (except Bay 7) .
¡P
Installation of stoplog at Bay
¡P
Remedial works for concrete plug at Bay 1B.
¡P
Mainlaying works for DN800 salt watermains (CHS
¡P
Backfilling works of Bay19B at the junction between
¡P
The ABWF works in WSD Salt Water Pumping Station,
including maintenance platform and external finishes.
¡P
The whole sewage outfall system under Section VI
was handed over to DSD.
¡P
Backfilling for the receiving pit adjacent to WCE
PTW at
¡P
Re-construction for the DSD Pumping Station
boundary wall at
¡P
The manhole for 1050 dia. concrete pipe between Bay
1 and the existing drainage.
¡P
Installation of concrete block and plastering works
wall for toilet over PT2 & PT3 at Level 1 (+4.15mPD).
¡P
Concreting of base slab and stem wall for PT4 &
PT5 at Level 1 (+4.15mPD) and top-slab.
¡P
Installation of Steel frame on Observation Deck.
¡P
Formwork erection for the late cast roof slab.
¡P
Concreting of western concrete staircase to Level
2; and its construction to Observation Deck Level.
¡P
Concreting of base slab and stem wall for PT1 at
Level 1 (+4.15mPD).
¡P
Concreting of
¡P
Installation of bracket and railing for the
proposed movable ramp system.
¡P
Planter wall and parapet wall construction at Level
2 and Observation Deck.
¡P
ABWF including brickworks and E&M cable tray at
1/F, 2/F and M/F.
¡P
Dredging of TWCR4 dredging works.
2.4.5. For
Contract no. HY/2009/15, the principal work activities in this reporting month
included:
¡P
Removal of eastern breakwater of CBTS
¡P
Installation of temporary wave protection barrier
at eastern breakwater
2.4.6. For
Contract no. HK/2010/06, the principal work activities in this reporting month
included:
¡P
Sheet Piling Works
¡P
Utility Diversion Works
¡P
Road surfacing preparatory works
¡P
Precast Unit Box Installation Preparation Works
(mainland
2.4.7. For
Contract no. HY/2009/19, the principal work activity in this reporting month
included:
¡P
Bored piling (Land)
¡P
D-wall and Barrette Construction
¡P
Construction works for Box Culvert T1
¡P
Construct ion of socket-H pile
¡P
Construction works for Culvert U1
¡P
Dismantling of marine platform
¡P
Demolition of parapet at IEC Link
¡P
Construction of Pile caps & columns (Marine)
¡P
Construction of dewatering well for Cut & Cover
Tunnel
¡P
D8-D9 Gantry Fabrication for precast segment
¡P
ELS for Cut & Cover Tunnel
¡P
Laying of 1500f pipe
2.4.8. For Contract no. HK/2012/08,
the principal work activity in this reporting month included:
¡P
Hoarding erection
¡P
Marine GI
2.4.9. In coming
reporting month, the principal work activities of individual contracts are
anticipated as follows:
Contract no. HK/2009/01 - Wan Chai Development
Phase II ¡V Central ¡VWanchai Bypass at HKCEC
Marine Works
¡P
Filling works up to +4.0mPD.
¡P
Steel bridge construction over temporary open
channel between CH220 and CH260.
¡P
Construction of mass concrete coping for new
seawall.
¡P
Installation of ELS for construction of proposed
box culvert Bay 8 and Bay 9. Subsequent Box Culvert construction for Bay 8
& 9.
¡P
Backfilling to temporary water channel for
subsequent demolition of promenade deck and pumping station at HKCEC Water
Channel.
¡P
Connection works of Pipeline D to exiting mains at
Wan Chai.
¡P
Connection works of Pipeline C to exiting mains at
Wan Chai.
Fresh Watermains, Cooling
Watermains and Salt Watermains (On Land)
¡P
Works at Zone B6-1B, B6-2A, B6-4, B6-5B, A2-3A,
A1-5C, A3-3C, C1-2 and X2-1.
¡P
Mainlaying works at Zone A2-3A and A1-5C.
¡P
Mainlaying works in Zone C1-2.
¡P
Mainlaying works for proposed sewerage system in
Zone B6-1B, B6-2A, B6-4.
¡P
Mainlaying works at Zone X2-1.
¡P
Tunnel Works
¡P
Installation of pre-bored H-pile in CWB Stage 1B
under the atrium link (from Ch80 to Ch220).
¡P
Installation of pre-bored H-pile in CWB Stage 1B
under the atrium link (from Ch120 to Ch220).
¡P
3rd Piling rig for pre-bored H piling works under
atrium would be mobilized to Site.
¡P
CWB diaphragm wall construction under the atrium
lin.
¡P
Construction of bulkhead Wall at Ch120.
¡P
Pre-drilling works for CWB (Stage 3).
¡P
Demolition of the promenade deck and pumping
stations at HKCEC Water Channel.
E&M Works
¡P
Full commissioning for Cooling Water Pumping
Station P5.
¡P
Handover inspection for Cooling Water Pumping
Station P3.
¡P
Handover inspection for Cooling Water Pumping
Station P5.
Application of Epoxy Lining
to Existing Box Culvert M (VO No.31)
¡P
Epoxy lining application to the western box of the
existing Box Culvert M.
Contract no. HK/2009/02 - Wan Chai Development Phase II ¡V Central ¡V Wan
Chai Bypass at WanChai East
¡P
Footpath reinstatement works of cooling mains near
Harbour Centre / Great Eagle Centre.
¡P
Remedial works and subsequent T&C for CRB
intake pipes within WCR1 area. Notification to stakeholder for switching over
for the proposed cooling water intake system.
¡P
Construction of pile caps for rectifying the
subsided intake pipes for both GE/HC and SHK.
¡P
Remaining DN800 salt watermins (CHS
¡P
Construction of remedial works for the concrete
plug at Bay 1B and the subsequent construction of Bay 1B and Bay 2B Intake Culvert.
¡P
All mainlaying works and prepare for connection
with the existing DN600 salt watermains at
¡P
Leakage test for the installed stoplog at Bay
¡P
Synthetic woods and façade works for the external
wall of WSD Salt Water Pumping Station.
¡P
Backfilling to Bay 6 to Bay 11 of Intake Culvert.
¡P
PLC & SCADA functional and performance tests
after completion of training to WSD staff.
¡P
Reinstatement works of DSD receiving pit at
¡P
Construction of Bay 4 & Bay 5 of the proposed
Box Culvert N1.
¡P
ABWF in Ferry Pier.
¡P
Installation of moveable ramp system included the
commencement of ramp installation
¡P
Civil works above the caisson seawall 2X including
staircase ST-1 and the plant room underneath the western staircase.
¡P
Late cast portion for Roof RC Superstructure above
the machine room in Level M.
¡P
Lift installation at Ferry Pier.
Contract no. HY/2009/15 - Central-Wanchai Bypass ¡V
Tunnel (
¡P
Removal of eastern breakwater of CBTS
¡P
Installation of temporary wave protection barrier
at eastern breakwater
¡P
Temporary works for EVA
Contract no. HK/2010/06 - Wan Chai Development
Phase II ¡V Central ¡V Wan Chai Bypass over MTR Tsuen Wan Line
¡P
Sheet Piling Works
¡P
Utility Diversion Works
¡P
Road surfacing works
¡P
Precast Unit Box Installation Preparation Works
(mainland
Contract no. HY/2009/19 ¡V Central- Wan Chai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
¡P
D-wall and Barrette Construction
¡P
Construction works for Box Culvert T1
¡P
Construction works for Culvert U1
¡P
Construction of Pile cap (Land)
¡P
Demolition of parapet at IEC Link
¡P
Construction of dewatering well for Cut & Cover
Tunnel
¡P
Construction of pile cap, column & cross head
(Marine)
¡P
D8-D9 Gantry Fabrication for precast segment
¡P
ELS for Cut & Cover Tunnel
¡P
Laying of 1500f pipe
Contract no. HK/2012/08 ¡V Wan Chai Development
Phase II ¡V Central- Wan Chai Bypass at Wan Chai West
¡P
Hoarding
erection
¡P
Marine
GI
3.1.1. A summary
of the current status on licences and/or permits on environmental protection
pertinent to the Project is shown in Table 3.1.
Permits and/or
Licences |
Reference No. |
Issued Date |
Status |
Environmental Permit |
EP-356/2009 |
30 Jul 2009 |
Valid |
Environmental Permit |
EP-364/2009/A |
4 Aug 2010 |
Superseded |
Environmental Permit |
EP-364/2009/B |
20 Sep 2012 |
Valid |
Environmental Permit |
EP-364/2009 |
17 Aug 2009 |
Superseded |
Environmental Permit |
EP-376/2009 |
13 Nov 2010 |
Valid |
Further Environmental
Permit |
FEP-01/356/2009 |
18 Feb 2010 |
Surrendered |
Further Environmental
Permit |
FEP-02/356/2009 |
24 Mar 2010 |
Valid |
Further Environmental
Permit |
FEP-03/356/2009 |
24 Mar 2010 |
Valid |
Further Environmental Permit |
FEP-04/356/2009 |
15 Nov 2010 |
Valid |
Further Environmental Permit |
FEP-05/356/2009 |
24 Mar 2011 |
Valid |
Further Environmental Permit |
FEP-01/364/2009 |
24 Mar 2010 |
Valid |
Further Environmental Permit |
FEP-02/364/2009 |
21 Apr 2010 |
Valid |
Further Environmental Permit |
FEP-03/364/2009 |
12 Jul 2010 |
Surrendered |
Further Environmental Permit |
FEP-04/364/2009/A |
14 Oct 2010 |
Surrendered |
Further Environmental Permit |
FEP-05/364/2009/A |
15 Nov 2010 |
Valid |
Further Environmental Permit |
FEP-06/364/2009/A |
22 Nov 2010 |
Valid |
Further Environmental Permit |
FEP-07/364/2009/A |
25 Feb 2011 |
Valid |
Further Environmental Permit |
FEP-08/364/2009/A |
15 Jun 2012 |
Valid |
Further Environmental Permit |
FEP-06/356/2009 |
5 Mar 2013 |
Valid |
Further Environmental Permit |
FEP-09/364/2009/B |
5 Mar 2013 |
Valid |
3.1.2. Due to the
multi-contract nature of the Project, the status of permits and/or licences
under the individual contract(s) are presented as below:
Contract
no. HK/2009/01 - Wan Chai Development Phase II ¡V Central ¡VWanchai Bypass at
HKCEC
3.1.3. Summary of
the current status on licences and/or permits on environmental protection
pertinent and submission for contract no. HK/2009/01 under FEP-02/356/2009 are
shown in Table 3.4 and Table 3.5.
Table
3.4 Cumulative Summary of Valid Licences
and Permits under Contract no. HK/2009/01
Permits and/or Licences |
Reference No. |
Issued Date |
Valid Period/
Expiry Date |
Status |
Further Environmental Permit |
FEP-02/356/2009 |
24 Mar 2010 |
N/A |
Valid |
FEP-02/364/2009 |
21 Apr 2010 |
N/A |
Valid |
|
Notification of Works Under APCO |
313088 |
06 Jan 2010 |
N/A |
Valid |
Construction Noise
Permit (CNP) for non-piling equipment |
GW-RS-1293-12 |
10 Dec 2012 |
10 Dec 2012 to 9
June 2013 |
Valid |
|
GW-RS1011-12 |
26 Sep 2012 |
30 Sep 2012 to 29 Mar 2013 |
Cancelled |
|
GW-RS0166-13 |
14 Feb 2013 |
16 Feb 2013 to 13 Aug 2013 |
Valid |
|
GW-RS0274-13 |
19 Mar 2013 |
25 Mar 2013 to 24 Sept 2013 |
Valid |
|
GW-RS0310-13 |
25 Mar 2013 |
27 Mar 2013 to 25 Sept 2013 |
Valid |
|
GW-RE0274-13 |
26 Mar 2013 |
30 Mar 2013 to 29 Sept 2013 |
Valid |
GW-RE0793-12 |
21 Sep 2012 |
30 Sep 2012 to 29 Mar 2013 |
Expired |
|
GW-RS1040-12 |
10 Oct 2012 |
13 Oct 2012 to 12 Apr 2013 |
Expired |
|
GW-RS1177-12 |
15 Nov 2012 |
17 Nov 2012 to 10 May 2013 |
Valid |
|
GW-RS1184-12 |
15 Nov 2012 |
17 Nov 2012 to 8 May 2013 |
Replaced by GW-RS0166-13 |
|
GW-RS1185-12 |
19 Nov 2012 |
21 Nov 2012 to 8 May 2013 |
Valid |
|
|
GW-RS1179-12 |
20 Nov 2012 |
22 Nov 2012 to 21 May 2013 |
Replaced by GW-RS0310-13 |
GW-RS1187-12 |
20 Nov 2012 |
27 Nov 2012 to 26 May 2013 |
Valid |
|
GW-RS1199-12 |
20 Nov 2012 |
26 Nov 2012 to 25 May 2013 |
Replaced by GW-RS0368-13 |
|
GW-RS-0052-13 |
18 Jan 2013 |
20 Jan 2013 to 19 July 2013 |
Valid |
|
GW-RE0371-13 |
9 Apr 2013 |
13 Arp 2013 to 12 Oct 2013 |
Valid |
|
GW-RS0368-13 |
11 Apr 2013 |
13 Apr 2013 to 7 Oct 2013 |
Valid |
|
GW-RS0372-13 |
12 Apr 2013 |
15 Apr 2013 to 7 Oct 2013 |
Valid |
|
Discharge Licence |
WT00006220-2010 |
18 Mar 2010 |
31 Mar 2015 |
Valid |
WT00009641-2011 |
24 Jul 2011 |
31 Jul 2016 |
Valid |
|
Billing account under Waste Disposal
Ordinance |
7010069 |
21 Jan 2010 |
N/A |
Valid |
Registration as a Chemical Waste Producer |
WPN5213-134-C3585-01 |
21 Jan 2010 |
N/A |
Valid |
Dumping Permit (Type 1 ¡V |
EP/MD/13-096 |
3 Dec 2012 |
4 Dec 2012 to 3 June 2013 |
Valid |
Table
3.5 Summary of submission status under
FEP-02/356/2009 Condition
EP Condition |
Submission |
Date of Submission |
Condition 2.6 |
Management Organization of Main Construction Companies |
13 Apr 2010 |
Condition 2.7 |
Works Schedule and
Location Plan |
8 Apr 2010 |
Condition 2.8 |
Silt Curtain
Deployment Plan (Rev. 5) |
24 Aug 2012 |
Silt Curtain
Deployment Plan (Rev. 4) |
12 July 2012 |
|
Silt Curtain
Deployment Plan (Rev. 3) |
27 June 2012 |
|
Silt Curtain
Deployment Plan |
19 Apr 2010 |
|
Condition 2.9 |
Silt Screen
Deployment Plan (Rev.4) |
15 Nov 2012 |
Silt Screen
Deployment Plan |
19 Apr 2010 |
|
Conditions 2.8 and
2.9 |
Supplementary
Document on Silt Curtain and Silt Screen Deployment Plan |
19 Jul 2010 |
Report on Field
Testing for Silt Curtain |
26 Aug 2010 |
|
Report on Field
Testing for Silt Curtain (Rev. A) |
15 Nov 2010 |
|
Condition 2.12(d) |
Alternative
Proposal on Concurrent Dredging for Sewage Pipeline and |
15 Apr 2011 |
Condition 2.17 |
Noise Management
Plan |
23 Apr 2010 |
Condition 2.18 |
Landscape Plan
(Erection of Decorative Screen Hoarding along Construction Site around |
15 May 2010 |
Landscape Plan
(Night-time Lighting) |
22 Oct 2010 |
|
Landscape Plan
(Rev. B) |
15 Nov 2010 |
Contract no. HK/2009/02 - Wan Chai
Development Phase II ¡V Central ¡V Wan Chai Bypass at WanChai East
3.1.4. Summary of the current status on licences and/or permits on
environmental protection pertinent and submission for contract no. HK/2009/02
under FEP-03/356/2009 are shown in Table 3.6 and Table 3.7.
Table
3.6 Cumulative Summary of Valid Licences
and Permits under Contract no. HK/2009/02
Permits and/or Licences |
Reference No. |
Issued Date |
Valid Period/
Expiry Date |
Status |
FEP-03/356/2009 |
24 Mar 2010 |
N/A |
Valid |
|
|
FEP-01/364/2009 |
24 Mar 2010 |
N/A |
Valid |
Notification of Works Under APCO |
313962 |
2 Feb 2010 |
N/A |
Valid |
Construction Noise Permit (CNP) for
non-piling equipment |
GW-RS1038-12 |
10 Oct 2012 |
10 Oct 2012 to 9 Apr 2013 |
Valid |
|
GW-RS1069-12 |
17 Oct 2012 |
19 Oct 2012 to 18 Apr 2013 |
Valid |
|
GW-RS1076-12 |
25 Oct 2012 |
1 Nov 2012 to 30 Apr 2013 |
Valid |
|
GW-RS1084-12 |
25 Oct 2012 |
1 Nov 2012 to 30 Apr 2013 |
Valid |
|
GW-RS1086-12 |
25 Oct 2012 |
28 Oct 2012 to 16 Apr 2013 |
Valid |
|
GW-RS1174-12 |
9 Nov 2012 |
11 Nov 2012 to 10 May 2013 |
Valid |
|
GW-RS1158-12 |
16 Nov 2012 |
18 Nov 2012 to 16 May 2013 |
Valid |
GW-RS1167-12 |
16 Nov 2012 |
23 Nov 2012 to 21 May 2013 |
Valid |
|
GW-RS1204-12 |
9 Nov 2012 |
29 Nov 2012 to 23 May 2013 |
Valid |
|
GW-RS1272-12 |
5 Dec 2012 |
5 Dec 2012 to 26 May 2013 |
Valid |
|
GW-RS1223-12 |
27 Nov 2012 |
7 Dec 2012 to 5 June 2013 |
Valid |
|
GW-RS1228-12 |
30 Nov 2012 |
30 Nov 2012 to 29 May 2013 |
Valid |
|
GW-RE1055-12 |
30 Nov 2012 |
3 Dec 2012 to 29 May 2013 |
Valid |
|
GW-RS1243-12 |
3 Dec 2012 |
5 Dec 2012 to 29 May 2013 |
Valid |
|
GW-RS1245-12 |
5 Dec 2012 |
6 Dec 2012 to 5 June 2013 |
Valid |
|
GW-RS1381-12 |
31 Dec 2012 |
9 Jan 2013 to 7 July 2013 |
Valid |
|
GW-RS1384-12 |
31 Dec 2012 |
17 Jan 2013 to 6 July 2013 |
Valid |
|
GW-RS0062-13 |
17 Jan 2013 |
21 Jan 2013 to 15 July 2013 |
Valid |
|
GW-RS0155-13 |
15 Feb 2013 |
16 Feb 2013 to 14 Aug 2013 |
Valid |
|
GW-RS0241-13 |
11 Mar 2013 |
13 Mar 2013 to 1o Sept 2013 |
Valid |
|
GW-RS0251-13 |
11 Mar 2013 |
26 Mar 2013 to 24 Sept 2013 |
Valid |
|
GW-RS0206-13 |
22 Feb 2013 |
24 Feb 2013 to 19 Aug 2013 |
Valid |
|
GW-RS0269-13 |
23 Mar 2013 |
23 Mar 2013 to 19 Sept 2013 |
Valid |
|
GW-RS0340-13 |
28 Mar 2013 |
10 Apr 2013 to 8 Oct 2013 |
Valid |
|
GW-RS0373-13 |
9 Apr 2013 |
19 Apr 2013 to 17 Oct 2013 |
Valid |
|
GW-RS0437-13 |
26 Apr 2013 |
1 May 2013 to 29 Oct 2013 |
Valid |
|
Discharge Licence |
WT00006249-2010 |
22 Mar 2010 |
31 Mar 2015 |
Valid |
WT00006436-2010 |
15 Apr 2010 |
30 Apr 2015 |
||
WT00006673-2010 |
14 May 2010 |
31 Mar 2015 |
Cancelled |
|
WT00006757-2010 |
28 May 2010 |
31 May 2015 |
Valid |
|
WT00007129-2010 |
28 July 2010 |
31 Jul 2015 |
Valid |
|
WT00008982-2011 |
26 April 2011 |
30 April 2016 |
Valid |
|
WT00009691-2011 |
1 Aug 2011 |
31 July 2016 |
Valid |
|
Billing Account under Waste Disposal Ordinance (Land) |
7010255 |
10 Feb 2010 |
N/A |
Valid |
Billing Account under Waste Disposal Ordinance (Marine) |
7011496 |
6 Oct 2010 |
N/A |
Valid |
Registration as Chemical Waste Producer (Wan Chai) |
WPN5213-135-C3593-01 |
10 Mar 2010 |
N/A |
Valid |
Registration as Chemical Waste Producer (TKO 137) |
WPN5213-839-C3593-02 |
22 Sep 2010 |
N/A |
Valid |
Dumping Permit (Type 1 ¡V |
EP/MD/13-095 |
19 Nov 2012 |
29 Nov 2012 to 28 May 2013 |
Valid |
Dumping Permit (Type 1 ¡V Open Sea Disposal (Dedicate Sites) & Type
2 ¡V Confined Marine disposal) |
EP/MD/13-127 |
4 Mar 2013 |
6 Mar 2013 to 5 Apr 2013 |
Valid |
EP/MD/13-139 |
27 Mar 2013 |
6 Apr 2013 to 5 May 2013 |
Valid |
Table
3.7 Summary of submission status under
FEP-03/356/2009 Condition
EP Condition |
Submission |
Date of Submission |
Condition 1.12 |
Commencement Date
of Construction of Marine Works |
8 April 2010 |
Condition 2.6 |
Management
Organization of Main Construction Companies |
10 April 2010 |
Condition 2.7 |
Works Schedule and
Location Plans |
8 April 2010 |
Condition 2.8 |
Silt Curtain
Deployment Plan (Revision A) |
20 April 2010 |
Silt Curtain
Deployment Plan (Revision B) |
25 May 2010 |
|
Silt Curtain
Deployment Plan (Revision C) |
14 Jun 2010 |
|
Silt Curtain
Deployment Plan (Revision H) |
15 Feb 2011 |
|
Silt Curtain
Deployment Plan (Revision I) |
17 Nov 2011 |
|
Silt Curtain
Deployment Plan (Revision J) |
15 Feb 2012 |
|
Silt Curtain
Deployment Plan (Revision K) |
3 May 2012 |
|
Silt Curtain
Deployment Plan (Revision L) |
25 Oct 2012 |
|
Silt Curtain
Deployment Plan (Revision M) |
30 Nov 2012 |
|
|
Silt Screen
Deployment Plan |
21 April 2010 |
Supplementary Information
for Existing WSD Salt Water Intakes at |
5 Oct 2010 |
|
Silt Screen
Deployment Plan (Revision B) |
15 Feb 2012 |
|
Silt Screen
Deployment Plan (Revision C) |
3 May 2012 |
|
Silt Screen
Deployment Plan (Revision D) |
10 Dec 2012 |
|
Condition 2.17 |
Noise Management
Plan |
6 May 2010 |
Condition 2.18 |
Landscape Plan
(Decorative Screen Hoarding) |
11 May 2010 |
Landscape Plan
(Control of Night Time Lighting) |
2 June 2010 |
|
Landscape Plan
(Combined Version) |
20 July 2011 |
|
Landscape Plan
(Combined Version) |
5 Aug 2011 |
|
----- |
Acknowledge of
Submission |
22 Aug 2011 |
Contract no. HY/2009/15 - Central-Wanchai
Bypass ¡V Tunnel (
3.1.5. Summary of
the current status on licences and/or permits on environmental protection
pertinent and submission for contract no. HY/2009/15 under EP-356/2009 are
shown in Table 3.8 and Table 3.9.
Table
3.8 Cumulative Summary of Valid Licences
and Permits under Contract no. HY/2009/15
Permits and/or Licences |
Reference No. |
Issued Date |
Valid Period/ Expiry
Date |
Status |
Further Environmental Permit |
FEP-04/356/2009 |
22 Nov 2010 |
N/A |
Valid |
Notification of Works Under APCO |
321822 |
24 Sep 2010 |
N/A |
Valid |
Construction Noise Permit (CNP) for Filling and Diaphragm Wall Works
at TS4/ME4 |
GW-RS1191-12 |
26 Nov 2012 |
26 Nov 2012
to 11 May 2013 |
Cancelled |
Construction Noise
Permit (CNP) for breakwater removal works at Eastern Breakwater of CBTS |
GW-RS0325-13 |
27 Mar 2013 |
29 Mar 2013 to 27
Sep 2013 |
Valid |
Construction Noise
Permit (CNP) for ELS and rock breaking works at TS4/ME4 |
GW-RS0276-13 |
19 Mar 2013 |
19 Mar 2013 to 7 Sep 2013 |
Cancelled |
Construction Noise
Permit (CNP) for Pre-treatment, ELS and rock breaking works at TS4/ME4 |
GW-RS0434-13 |
23 Apr 2013 |
23 Apr 2013 to 16
Oct 2013 |
Valid |
Registration as a
Chemical Waste Producer |
WPN5213-147-C1169-35 |
15 Nov 2010 |
N/A |
Valid |
Billing Account under Waste Disposal
Ordinance |
7011553 |
30 Sep 2010 |
27 Sep 2010
to 27 Jan
2016 |
Valid |
Billing Account under Waste Disposal
Ordinance (Dumping by Vessel) |
7011761 |
03 Oct 2012 |
17 Jan
2013 to 16 Apr 2013 |
|
7011761 |
25 Mar 2013 |
17 Apr
2013 to 16 Jul 2013 |
Valid |
|
Dumping Permit (Type 1 ¡V |
EP/MD/13-097 |
28 Nov 2012 |
6 Dec 2012 to
5 Jun 2013 |
Cancelled |
EP/MD/13-113 |
22 Jan 2013 |
24 Jan 2013
to 23 Jul 2013 |
Valid |
|
Dumping Permit (Type 2 ¡V Confined Marine
Disposal) |
EP/MD/13-130 |
20 Mar 2013 |
20 Mar 2013 to 19 Apr 2013 |
Expired |
EP/MD/14-001 |
16 Apr 2013 |
20 Apr 2013
to 19 May 2013 |
Valid |
Table
3.9 Summary of submission status under
FEP-04/356/2009 Condition
FEP Condition |
Submission |
Date of Submission |
Condition 2.6 |
Management Organization of Main Construction
Companies |
30 Sep 2010 |
Amendment for Management Organization of Main
Construction Companies |
16 May 2011 |
|
Condition 2.7 |
Works Schedule and Location Plans |
27 Oct 2010 |
|
Amendment for Works Schedule and Location
Plans |
12 Nov 2010 |
Condition 2.8 |
Silt Curtain Deployment Plan |
30 Nov 2010 |
|
Amendment for Silt Curtain Deployment Plan |
24 Feb 2011 |
Amendment for Silt Curtain Deployment Plan |
11 May 2011 |
|
Amendment for Silt Curtain Deployment Plan |
11 Sep 2012 |
|
Amendment for Silt Curtain Deployment Plan |
30 Oct 2012 |
|
Condition 2.9 |
Silt Screen
Deployment Plan |
19 Oct 2010 |
Amendment for Silt Screen Deployment Plan |
18 Feb 2011 |
|
Amendment for Silt Screen Deployment Plan |
15 Jun 2011 |
|
Condition 2.18 |
Proposal
for the Removal of Odorous Sediment and Slime |
13 Jan 2011 |
Amendment for Proposal for the Removal of
Odorous Sediment and Slime |
8 Mar 2011 |
|
|
Amendment for Proposal for the Removal of
Odorous Sediment and Slime |
2 Aug 2011 |
Condition 2.21 |
Landscape Plan |
18 Feb 2011 |
Condition 2.23 |
Noise Management Plan |
20 Oct 2010 |
Amendment for Noise Management Plan |
27 Jan 2011 |
3.1.6. Implementation
status of the recommended mitigation measures during this reporting period is
presented in Appendix 3.1.
Contract no. HK/2010/06 - Wan Chai
Development Phase II ¡V Central ¡VWanchai Bypass over MTR Tsuen Wan Line
3.1.7. Summary of
the current status on licences and/or permits on environmental protection
pertinent and submission for contract no. HK/2010/06 under EP-356/2009 are
shown in Table 3.10 and Table 3.11.
Table
3.10 Cumulative
Summary of Valid Licences and Permits under Contract no. HK/2010/06
Permits and/or Licences |
Reference No. |
Issued Date |
Valid Period/
Expiry Date |
Status |
Further Environmental Permit |
FEP-05/356/2009 |
24 Mar 2011 |
N/A |
Valid |
FEP-08/364//2009/A |
15 June
2012 |
N/A |
Valid |
|
Notification of Works Under APCO |
326344 |
18 Jan 2011 |
N/A |
Valid |
Construction Noise Permit (CNP) for piling
equipment |
PP-RS0001-13 |
3 Jan 2013 |
6 Jan 2013 to 5 Jul 2013 |
Valid |
Construction Noise Permit (CNP) for
non-piling equipment |
GW-RS0923-12 |
4 Sept 2012 |
15 Oct 2012 to 14 Apr 2013 |
Replaced by GW-RS0056-13 |
|
GW-RS0989-12 |
21 Sept 2012 |
6 Oct 2012 to 5 Apr 2013 |
Expired |
|
GW-RS0056-13 |
14 Jan 2013 |
16 Jan 2013 ¡V 12 Jul 2013 |
Valid |
Billing Account under Waste Disposal
Ordinance |
7012338 |
16 Feb 2011 |
N/A |
Valid |
Registration as Chemical Waste Producer |
WPN5213-134-G2533-01 |
11 Feb 2011 |
N/A |
Valid |
Water Discharge
Licence |
WT00010905-2011 |
4 November 2011 |
31 July 2016 |
Valid` |
Table
3.11 Summary of
submission status under EP-356/2009 and FEP-05/356/2009 Condition
EP Condition |
Submission |
Date
of Submission |
Condition 2.6 |
Management Organization of Main Construction Companies |
29 April 2011 |
Condition 2.7 |
Works Schedule and Location Plans |
11 March 2011 |
Condition 2.8 |
Revised Silt Curtain Deployment Plan |
31 August 2011 |
Revised Silt Curtain Deployment Plan |
22 October 2012 |
|
Revised Silt Curtain Deployment Plan |
26 November 2012 |
|
Full Silt Curtain Deployment Plan |
28 January 2013 |
|
Condition 2.9 |
Silt Screen Deployment Plan |
11 April 2011 |
Condition 2.23 |
Noise Management Plan |
11 March 2011 |
Contract no. HY/2009/19 ¡V Central- Wan Chai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
3.1.8. Summary of
the current status on licences and/or permits on environmental protection
pertinent for contract no. HY/2009/19 is shown in Table 3.12.
Table 3.12 Cumulative
Summary of Valid Licences and Permits under Contract no. HY/2009/19
Permit / Licence / Notification /
Approval |
Reference No. |
Issued Date |
Valid Period / Expiry date |
Status |
Further Environmental Permit |
FEP-07/364/2009/B |
20 Sep 2012 |
Granted |
Valid |
Notification of Works Under APCO |
326160 |
24 Jan 2011 |
Notified |
Valid |
Construction Noise Permit (CNP) (For D-wall
construction) (Portion I, VII, VIII & IX) |
GW-RS0286-13 |
15-Mar-12 |
14-Sep-13 |
Valid |
Construction Noise Permit (CNP) (For Bored
pile construction at Portion III) |
GW-RS0013-13 |
08-Jan-13 |
07-Jul-13 |
Valid |
Construction Noise
Permit (CNP) (For |
GW-RS1230-12 |
28-Nov-12 |
25-May-13 |
Valid |
Construction Noise
Permit (CNP) (For IEC) |
GW-RS1210-12 |
29-Nov-12 |
28-May-13 |
Cancelled |
|
GW-RS0046-13 |
18-Jan-13 |
10-Jul-13 |
Valid |
Construction Noise
Permit (CNP) (For IEC Parapet Removal ¡V Loading/Unloading) |
GW-RS1065-12 |
16-Oct-12 |
20-Apr-13 |
Expired |
GW-RS0365-13 |
21-Apr-13 |
20-Oct-13 |
Valid |
|
Construction Noise
Permit (CNP) (For Portion Vi Marine) |
GW-RS0010-13 |
08-Jan-13 |
07-Jul-13 |
Cancelled |
GW-RS0337-13 |
05-May-13 |
01-Oct-13 |
Valid |
|
Discharge Licence
(Land) |
WT00010093-2011 |
17 Aug 2012 |
30-Sept-16 |
Valid |
Discharge Licence (Sea) |
WT00010865-2011 |
03 Nov 2011 |
30-Nov-16 |
Valid |
C&D Waste Disposal |
7012306 |
10 Feb 2011 |
Registered |
- |
Vessel Disposal |
7013285 |
21 July 2011 |
Registered |
- |
Registration as Chemical Waste Producer |
5213-151-C3654-01 |
24 Mar 2011 |
Registered |
- |
Dumping Permit (Type
1 ¡V |
EP/MD/13-101 |
24 Dec 2012 |
23 May 2013 |
Valid |
Dumping Permit (Type
2 ¡V Confined Marine Disposal) |
EP/MD/13-126 |
06 Mar 2013 |
05 Apr 2013 |
Valid |
Contract no. HK/2012/08 ¡V Wan Chai Development
Phase II ¡V Central- Wan Chai Bypass at Wan Chai West
3.1.9. Summary of
the current status on licences and/or permits on environmental protection
pertinent and submission for contract no. HK/2012/08 under EP-356/2009 are
shown in Table 3.13 and Table 3.14.
Table 3.13 Cumulative
Summary of Valid Licences and Permits under Contract no. HK/2012/08
Permits and/or Licences |
Reference No. |
Issued Date |
Valid Period/ Expiry Date |
Status |
Further Environmental Permit |
FEP-06/356/2009 |
5 Mar 2013 |
N/A |
Valid |
Notification of Works Under APCO |
355439 |
4 Feb 2013 |
N/A |
Valid |
Registration as a Chemical Waste Producer |
5213-134-C3790-01 |
8 Mar 2013 |
N/A |
Valid |
Billing Account under Waste Disposal Ordinance |
7016883 |
18 Feb 2013 |
18 Jul 2017 |
Valid |
Table 3.14 Summary
of submission status under EP-356/2009 and FEP-06/356/2009 Condition
FEP Condition |
Submission |
Date of Submission |
Condition 2.8 |
Silt Curtain Deployment Plan |
Submitted to ET and IEC for comment on 22 Apr 2013 |
Condition 2.9 |
Silt Screen Deployment Plan |
Under preparation |
Condition 2.23 |
Noise Management Plan |
Submitted to EPD on 22 Apr 2013 |
Condition 2.24 |
Landscape Plan |
Comments received from ET and responded by CSLJV on 11
Apr 2013. Pending certification
by ET and verification by IEC. |
Noise Monitoring Stations
4.1.1. The noise
monitoring stations for the Project are listed and shown in Table 4.1
and Figure 4.1. Appendix 4.1 shows the established
Action/Limit Levels for the monitoring works.
Table 4.1 Noise
Monitoring Station
Station |
Description |
M1a |
Harbour Road Sports Centre |
M2b |
Noon Gun Area |
M3a |
Tung Lo Wan Fire
Station |
M4b |
Victoria Centre |
M5b |
|
M6 |
HK |
Real-time Noise Monitoring
Stations
4.1.2. The
real-time noise monitoring stations for the Project are listed and shown in Table
4.2 and Figure 4.1. Appendix 4.1 shows the established
Action/Limit Levels for the monitoring works.
4.1.3.
The real-time noise monitoring at RTN2-Oil
Street Community Liaison Centre has been relocated to City Garden Electric
Centre (RTN2a- Electric Centre) on 5 Oct 2012, which is a representative of
noise sensitive
4.1.4. As the
land-based piling and filling works- DP3 at Tin Hau had been completed on 3
September 2012 and confirmed by RSS, the real-time noise monitoring results at FEHD
Hong Kong Transport Section Whitfield Depot was excluded under EP-356/2009
since 28 November 2012.
Table 4.2 Real
Time Noise Monitoring Station
District |
Station |
Description |
Tin Hau |
RTN1 |
FEHD Hong Kong
Transport Section Whitfield Depot |
North Point |
RTN2 |
Oil Street
Community Liaison Centre |
North Point |
RTN2a |
Electric Centre |
Noise Monitoring
Parameters, Frequency and Duration
4.1.5. The construction noise level shall be measured in
terms of the A-weighted equivalent continuous sound pressure level (Leq).
Leq (30 minutes) shall be used as the monitoring parameter for the
time period between 0700 and 1900 hours on normal weekdays. For all other time
periods, Leq (5 minutes) shall be employed for comparison with the
Noise Control Ordinance (NCO) criteria.
Supplementary information for data auditing, statistical results such as L10
and L90 shall also be obtained for reference.
4.1.6. Noise
monitoring shall be carried out at all the designated monitoring stations. The
monitoring frequency shall depend on the scale of the construction activities.
The following is an initial guide on the regular monitoring frequency for each
station on a weekly basis when noise generating activities are underway:
¡P
one
set of measurements between 0700 and 1900 hours on normal weekdays.
4.1.7. If
construction works are extended to include works during the hours of 1900 ¡V
0700 as well as public holidays and Sundays, additional weekly impact
monitoring shall be carried out during respective restricted hours periods.
Applicable permits under NCO shall be obtained by the Contractor.
Monitoring Equipment
4.1.8. As
referred to in the Technical Memorandum ™ issued under the NCO, sound level
meters in compliance with the International Electrotechnical Commission
Publications 651: 1979 (Type 1) and 804: 1985 (Type 1) specifications shall be
used for carrying out the noise monitoring. Immediately prior to and following
each noise measurement the accuracy of the sound level meter shall be checked
using an acoustic calibrator generating a known sound pressure level at a known
frequency. Measurements may be accepted as valid only if the calibration level
from before and after the noise measurement agree to within 1.0 dB.
4.1.9. Noise
measurements shall not be made in fog, rain, wind with a steady speed exceeding
5 m/s or wind with gusts exceeding 10 m/s. The wind speed shall be checked with
a portable wind speed meter capable of measuring the wind speed in m/s.
Air Quality Monitoring
Stations
4.2.1. The air
monitoring stations for the Project are listed and shown in Table 4.3 and
Figure 4.1. Appendix 4.1 shows the established
Action/Limit Levels for the monitoring works.
Table
4.3 Air Monitoring Station
Station ID |
Monitoring
Location |
Description |
CMA1b |
Oil Street Community
Liaison Centre |
North Point |
CMA2a |
|
|
CMA3a |
CWB PRE Site Office * |
|
CMA4a |
Society for the
Prevention of Cruelty to Animals |
Wan Chai |
CMA5a |
Children Playgrounds
opposite to |
Wan Chai |
CMA6a |
WDII PRE Site Office * |
Wan Chai |
* Remarks:
As per the ENPC meeting in January 2011, the monitoring stations CMA3a - Future
CWB site office at Wanchai Waterfront Promenade and CMA6a - Future AECOM site
office at Work Area were renamed as remark.
Air Monitoring Parameters,
Frequency and Duration
4.2.2. One-hour
and 24-hour TSP levels should be measured to indicate the impacts of
construction dust on air quality. The 24-hour TSP levels shall be measured by
following the standard high volume sampling method as set out in the Title 40
of the Code of Federal Regulations, Chapter 1 (Part 50), Appendix B.
4.2.3. All
relevant data including temperature, pressure, weather conditions, elapsed-time
meter reading for the start and stop of the sampler, identification and weight
of the filter paper, and any other local atmospheric factors affecting or
affected by site conditions, etc., shall be recorded down in detail.
4.2.4. For
regular impact monitoring, the sampling frequency of at least once in every
six-days, shall be strictly observed at all the monitoring stations for 24-hour
TSP monitoring. For 1-hour TSP monitoring, the sampling frequency of at least
three times in every six-days should be undertaken when the highest dust impact
occurs.
Sampling Procedure and
Monitoring Equipment
4.2.5. High
volume samplers (HVSs) in compliance with the following specifications shall be
used for carrying out the 1-hour and 24-hour TSP monitoring:
¡P
0.6
- 1.7 m3 per minute adjustable flow range;
¡P
equipped
with a timing / control device with +/- 5 minutes accuracy for 24 hours
operation;
¡P
installed
with elapsed-time meter with +/- 2 minutes accuracy for 24 hours operation;
¡P
capable
of providing a minimum exposed area of 406 cm2;
¡P
flow
control accuracy: +/- 2.5% deviation over 24-hour sampling period;
¡P
equipped
with a shelter to protect the filter and sampler;
¡P
incorporated
with an electronic mass flow rate controller or other equivalent devices;
¡P
equipped
with a flow recorder for continuous monitoring;
¡P
provided
with a peaked roof inlet;
¡P
incorporated
with a manometer;
¡P
able
to hold and seal the filter paper to the sampler housing at horizontal
position;
¡P
easily
changeable filter; and
¡P
capable
of operating continuously for a 24-hour period.
4.2.6. Initial
calibration of dust monitoring equipment shall be conducted upon installation
and thereafter at bi-monthly intervals. The transfer standard shall be
traceable to the internationally recognized primary standard and be calibrated
annually. The concern parties such as IEC shall properly document the
calibration data for future reference. All the data should be converted into
standard temperature and pressure condition.
Laboratory Measurement /
Analysis
4.2.7. A clean
laboratory with constant temperature and humidity control, and equipped with
necessary measuring and conditioning instruments to handle the dust samples
collected, shall be available for sample analysis, and equipment calibration
and maintenance. The laboratory should be HOKLAS accredited.
4.2.8. An alternative non-HOKLAS
accredited laboratory was set-up
for carrying out the laboratory analysis, the laboratory equipment was approved by the ER on 8 February 2011 and the
measurement procedures were
witnessed by the IEC. Any measurement performed by the laboratory was be demonstrated to the satisfaction
of the ER and IEC. IEC shall regularly audit to the measurement performed by
the laboratory to ensure the accuracy of measurement results.
4.2.9. Filter
paper of size 8" x 10" shall be labelled before sampling. It shall be
a clean filter paper with no pinholes, and shall be conditioned in a
humidity-controlled chamber for over 24-hours and be pre-weighed before use for
the sampling.
4.2.10. After
sampling, the filter paper loaded with dust shall be kept in a clean and
tightly sealed plastic bag. The filter paper shall then be returned to the
laboratory for reconditioning in the humidity controlled chamber followed by
accurate weighing by an electronic balance with readout down to 0.1 mg. The
balance shall be regularly calibrated against a traceable standard.
4.2.11. All the
collected samples shall be kept in a good condition for 6 months before
disposal.
impact monitoring for
odour patrol
4.2.12. Odour
patrols along the shorelines of Causeway Bay Typhoon Shelter and ex-Wan Chai
Public Cargo Working Area when there is temporary reclamation in Causeway Bay
Typhoon Shelter and/or in the ex-Wan Chai Public Cargo Working Area, or when
there is dredging of the odorous sediment and slime at the south-western corner
of the Causeway Bay Typhoon Shelter. Odour patrols will be carried out at
bi-weekly intervals during July, August and September by a qualified person of
the ET who shall:
¡P
be
at least 16 years of age;
¡P
be
free from any respiratory illnesses; and
¡P
not
be allowed to smoke, eat, drink (except water) or use chewing gum or sweets 30
min
¡P
before
and during odour patrol
4.2.13. Odour
patrol shall be conducted by independent trained personnel / competent persons
patrolling and sniffing around the shore as shown in Figure 4.1 to detect any
odour at the concerned hours (afternoon is preferred for higher daily
temperature).
4.2.14. The
qualified person will use the nose (olfactory sensor) to sniff odours at
different locations. The main odour emission sources and the areas to be
affected by the odour nuisance will be identified.
4.2.15. The
perceived odour intensity is to be divided into 5 levels which are ranked in
the descending order as follows:
¡P
0 -
Not detected. No odour perceived or an odour so weak that it cannot be easily characterized
or described;
¡P
1 -
Slight Identifiable odour, and slight chance to have odour nuisance;
¡P
2 -
Moderate Identifiable odour, and moderate chance to have odour nuisance;
¡P
3 -
Strong Identifiable, likely to have odour nuisance;
¡P
4 -
Extreme Severe odour, and unacceptable odour level.
4.2.16.
The findings including odour intensity, odour
nature and possible odour sources, and also the local wind speed and direction
at each location will be recorded. In addition, some relevant meteorological
and tidal data such as daily average temperature, and daily average humidity,
on that surveyed day will be obtained from the Hong Kong Observatory Station
for reference. The Action and Limit levels for odour patrol are shown in Appendix 6.1.
4.2.17. The
qualified odour patrol member has individual n-butanol thresholds complied with
the requirement of European Standard Method of Air Quality ¡V Determination of
Odour Concentration by Dynamic Olfactometry (EN13725) in the range of 20 to 80
ppb.
4.3.1. The EIA
Report has identified that the key water quality impact would be associated
with the dredging works during the construction phase. Marine water quality
monitoring for dissolved oxygen (DO), suspended solid (SS) and turbidity is
therefore recommended to be carried out at selected WSD flushing water intakes.
The impact monitoring should be carried out during the proposed dredging works
to ensure the compliance with the water quality standards.
4.3.2. The
updated EM&A Manual for EP-356/2009 (Version in March 2011) is approval by
EPD on 29 April 2011. As such, the Action Level and Limit Level for the wet
season (April ¡V September) will be effected and applied to the water quality
monitoring data from 30 April 2011.
Water Quality Monitoring Stations
4.3.3. It is
proposed to monitor the water quality at 9 WSD salt water intakes and 14
cooling water intakes along the seafront of the
Table 4.4 Marine
Water Quality Stations for Water Quality Monitoring
Station Ref. |
Location |
Easting |
Northing |
WSD Salt Water Intake |
|||
WSD7 |
|
834150.0 |
818300.3 |
WSD9 |
Tai Wan |
837921.0 |
818330.0 |
WSD10 |
Cha Kwo Ling |
841900.9 |
817700.1 |
WSD15 |
Sai Wan Ho |
841110.4 |
816450.1 |
WSD17 |
|
839790.3 |
817032.2 |
WSD19 |
Sheung Wan |
833415.0 |
816771.0 |
WSD20 |
|
830750.6 |
816030.3 |
WSD21 |
Wan Chai |
836220.8 |
815940.1 |
RW1 |
Wan Chai (Reprovision) |
836188.8 |
815911.1 |
Cooling Water Intake |
|||
C1 |
HKCEC Extension |
835885.6 |
816223.0 |
C2 |
Telecom House |
835647.9 |
815864.4 |
C3 |
HKCEC Phase I |
835836.2 |
815910.0 |
C4e |
Great Eagle Centre |
835932.8 |
815888.2 |
C4w |
Wan |
835629.8 |
815889.2 |
C5e |
Sun Hung Kai Centre (Eastern) |
836250.1 |
815932.2 |
C5w |
Sun Hung Kai Centre (Western) |
836248.1 |
815933.2 |
C6 |
Excelsior Hotel |
837009.6 |
815999.3 |
C7 |
|
837193.7 |
816150.0 |
C8 |
|
837970.6 |
816957.3 |
C9 |
Provident Garden |
838355.0 |
817116.6 |
RC1 |
Proposed HKAPA Extension |
835487.7 |
815987.7 |
RC5 |
Sun Hung Kai Centre (Reprovision) |
836291.4 |
816029.7 |
RC7 |
|
837245.2 |
816156.6 |
P1 |
HKCEC
Phase I |
835774.7 |
816179.4 |
P3 |
The |
835824.6 |
816212.0 |
P4 |
Shui on Centre |
835865.6 |
816220.0 |
P5 |
Government
Buildings ( |
835895.2 |
816215.2 |
Water Quality Parameters
4.3.4. Monitoring
of dissolved oxygen (DO), turbidity and suspended solids (SS) shall be carried
out at WSD flushing water intakes and cooling water intakes. DO and Turbidity
are measured in-situ while SS is determined in laboratory.
4.3.5. In
association with the water quality parameters, other relevant data shall also
be measured, such as monitoring location/position, time, sampling depth, water
temperature, pH, salinity, dissolved oxygen (DO) saturation, weather
conditions, sea conditions, tidal stage, and any special phenomena and work
underway at the construction site etc.
Sampling Procedures and
Monitoring Equipment
4.3.6. The
interval between two sets of monitoring should not be less than 36 hours except
where there are exceedances of Action and/or Limit Levels, in which case the
monitoring frequency will be increased. Table 4.5 shows the
proposed monitoring frequency and water quality parameters. Duplicate in-situ
measurements and water sampling should be carried out in each sampling event.
For selection of tides for in-situ measurement and water sampling, tidal range
of individual flood and ebb tides should be not less than 0.5m.
Table 4.5 Marine
Water Quality Monitoring Frequency and Parameters
Activities |
Monitoring Frequency1 |
Parameters2 |
During the 4-week
baseline monitoring period |
Three days per week,
at mid-flood and mid-ebb tides |
Turbidity, Suspended
Solids (SS), Dissolved Oxygen (DO), pH, Temperature, Salinity |
During marine construction works |
Three days per week,
at mid-flood and mid-ebb tides |
Turbidity, Suspended
Solids (SS), Dissolved Oxygen (DO), pH, Temperature, Salinity |
After completion of marine construction works |
Three days per week,
at mid-flood and mid-ebb tides |
Turbidity, Suspended
Solids (SS), Dissolved Oxygen (DO), pH, Temperature, Salinity |
Notes:
1.
For selection of tides for in-situ measurement
and water sampling, tidal range of individual flood and ebb tides should be not
less than 0.5m.
2.
Turbidity should be measured in situ whereas SS
should be determined by laboratory.
Dissolved Oxygen and
Temperature Measuring Equipment
4.3.7. The
instrument should be a portable, weatherproof dissolved oxygen measuring
instrument complete with cable, sensor, comprehensive operation manuals, and
use a DC power source. It should be capable of measuring:
¡P
a
dissolved oxygen level in the range of 0-20 mg/l and 0-200% saturation
¡P
a
temperature of 0-45 degree Celsius
4.3.8. It should
have a membrane electrode with automatic temperature compensation complete with
a cable. Sufficient stocks of spare electrodes and cables should be available
for replacement where necessary. (e.g. YSI model 59 meter, YSI 5739 probe, YSI
5795A submersible stirrer with reel and cable or an approved similar
instrument).
4.3.9. Should
salinity compensation not be build-in in the DO equipment, in-situ salinity
shall be measured to calibrate the DO equipment prior to each DO measurement.
Turbidity Measurement
Instrument
4.3.10. The
instrument should be a portable, weatherproof turbidity-measuring instrument
complete with comprehensive operation manual. The equipment should use a DC
power source. It should have a photoelectric sensor capable of measuring
turbidity between 0‑1000 NTU and be complete with a cable (e.g. Hach model
2100P or an approved similar instrument).
Sampler
4.3.11. A water
sampler comprises a transparent PVC cylinder, with a capacity of not less than
2 litres, and can be effectively sealed with latex cups at both ends. The
sampler should have a positive latching system to keep it open and prevent
premature closure until released by a messenger when the sampler is at the
selected water depth (e.g. Kahlsico Water Sampler or an approved similar
instrument).
Sample Container and
Storage
4.3.12. Water samples
for suspended solids measurement should be collected in high-density polythene
bottles, packed in ice (cooled to 4¢XC without being frozen), and delivered to
ALS Technichem (HK) Pty Ltd. as soon as possible after collection for analysis.
Water Depth Detector
4.3.13. A
portable, battery-operated echo sounder shall be used for the determination of
water depth at each designated monitoring station. This unit can either be
handheld or affixed to the bottom of the workboat, if the same vessel is to be
used throughout the monitoring programme.
Salinity
4.3.14. A portable
salinometer capable of measuring salinity in the range of 0-40 ppt shall be
provided for measuring salinity of the water at each of monitoring location.
Monitoring Position
Equipment
4.3.15. A
hand-held or boat-fixed type digital Global Positioning System (GPS) with
waypoint bearing indication or other equivalent instrument of similar accuracy
shall be provided and used during monitoring to ensure the monitoring vessel is
at the correct location before taking measurements.
Calibration of In-situ
Instruments
4.3.16. All
in-situ monitoring instrument shall be checked, calibrated and certified by a
laboratory accredited under HOKLAS or equivalent before use, and subsequently
re-calibrated at 3 monthly intervals throughout all stages of the water quality
monitoring. Responses of sensors and electrodes should be checked with
certified standard solutions before each use. Wet bulb calibration for a DO
meter shall be carried out before measurement at each monitoring location.
4.3.17. For the on
site calibration of field equipment by the ET, the BS 127:1993, "Guide to
Field and on-site test methods for the analysis of waters" should be
observed.
4.3.18. Sufficient
stocks of spare parts should be maintained for replacements when necessary.
Backup monitoring equipment shall also be made available so that monitoring can
proceed uninterrupted even when some equipment is under maintenance,
calibration, etc.
4.3.19. Current
calibration certificates of equipments are presented in Appendix
4.2.
Laboratory Measurement /
Analysis
4.3.20. Analysis
of suspended solids has been carried out in a HOKLAS accredited laboratory, ALS
Technichem (HK) Pty Ltd. Water samples of about 1L shall be collected at the
monitoring stations for carrying out the laboratory SS determination. The SS
determination work shall start within 24 hours after collection of the water
samples. The SS determination shall follow APHA 19ed or equivalent methods
subject to the approval of IEC and EPD.
Enhanced Water Quality
Monitoring in the ex-Wan Chai Public Cargo
Working Area and the
4.3.21. The
enhanced water quality monitoring and audit programme is to avoid aggravation
of odour nuisance from seawater arising from temporary reclamation in the
ex-Wan Chai Public Cargo Working Area and the Causeway Bay Typhoon Shelter.
4.3.22. Dissolved
oxygen monitoring at the intakes C6 and C7 in Causeway Bay Typhoon Shelter when
there is temporary reclamation in Causeway Bay Typhoon Shelter and at the
south-western and south-eastern corners of the ex-Wan Chai Public Cargo Working
Area. The proposed water quality monitoring stations of the Project are shown
in Table 4.6 and Figure 4.1.
Table
4.6 Marine Water
Quality Stations for Enhanced Water Quality Monitoring
Station |
Location |
C6 |
Excelsior
Hotel |
C7 |
|
Ex-WPCWA-SW |
South-western
of the ex-Wan Chai Public Cargo Working Area |
Ex-WPCWA-SE |
South-eastern
of the ex-Wan Chai Public Cargo Working Area |
4.3.23. The
monitoring of dissolved oxygen are to be carried out 3 days per week, at
mid-flood and mid-ebb tides for 3 water depths (1m below water surface,
mid-depth and 1m above sea bed, except where the water depth less than 6m, the
mid-depth may be omitted. If the water depth be equal to or less than 3m, only
the mid-depth will be monitored).
Daily SS Monitoring and 24
hours Turbidity Monitoring System
4.3.24.
During dredging of the sediment at the
south-western corner of the Causeway Bay Typhoon Shelter, daily
monitoring of suspended solids and 24 hour monitoring of turbidity at the
cooling water intakes (C6 and C7) shall be
conducted.
4.3.25.
The 24 hours monitoring of turbidty at the
cooling water intakes (C6 and C7) shall be established
by setting up a continuous water quality monitoring station in front of the
intakes during the dredging activities. The monitoring system include the
turbidity sensor and data logger which is capable of data capturing at every 5 minutes. The data sahll be downloaded daily and compared with the
Action and Limit level determined during the baseline water qualtiy monitoring
at the cooling water intake locations.
Additional Dissovled
oxygen Monitoring FOR CULVERT L WATER DISCHARGE FLOW
4.3.26.
In response to the Condition 2.18 of the Environmental Permit no.
EP-356/2009 requiring that a silt curtain / impermeable barrier system be
installed to channel water discharge flow from Culvert L to locations outside
the embayment area, a proposed replacement of the requirement with additional
dissolved oxygen monitoring has been conducted at three monitoring stations,
namely A, B and C between the eastern seawall of Central Reclamation Phase III
and the HKCEC Extension since November 2011 under EP-356/2009 so that DO level
between the eastern seawall of Central Reclamation Phase II and the HKCEC
extension could be continuously monitored.
4.3.27. The
proposed DO monitoring stations of the Project are shown in Table 4.7 and
Figure 4.1.
Table
4.7 Marine Water
Quality Stations for Additional DO Monitoring
Station |
Easting |
Northing |
A |
835468 |
815857 |
B |
835572 |
815961 |
C |
835659 |
816271 |
4.3.28.
The monitoring of dissolved oxygen are to be
carried out once per week, at mid-flood and mid-ebb tides for 3 water depths
(1m below water surface, mid-depth and 1m above sea bed, except where the water
depth less than 6m, the mid-depth may be omitted. If the water depth be equal
to or less than 3m, only the mid-depth will be monitored).
5.0.1. The
environmental monitoring will be implemented based on the division of works
areas of each designed project managed under different contracts with separate
FEP applied by individual contractors. Overall layout showing work areas of
various contracts, latest status of work commencement and monitoring stations
is shown in Figure 2.1 and Figure 4.1. The monitoring
results are presented in according to the Individual Contract(s).
5.0.2. In the
reporting month, the concurrent contracts are as follows:
Contract no. HK/2009/01 ¡V
Wan Chai Development Phase II ¡V Central-Wan Chai Bypass at
Contract no. HK/2009/02 Wan
Chai Development Phase II ¡V Central-Wan Chai Bypass at Wan Chai East
Contract no. HY/2009/15 -
Central-Wanchai Bypass ¡V Tunnel (
Contract no. HK/2010/06 Wan
Chai Development Phase II ¡V Central-Wan Chai Bypass over MTR Tsuen Wan Line
Contract no. HY/2009/19-
Cental- Wan Chai Bypass Tunnel (North Point Section) and Island Eastern
Corridor Link
Contract no. HK/2012/08 ¡V
Wan Chai Development Phase II ¡V Central- Wan Chai Bypass at Wan Chai West
5.0.3. The
environment monitoring schedules for reporting month and coming month are
presented in Appendix 5.1.
Contract no. HK/2009/01 - Wan Chai Development
Phase II ¡V Central ¡VWanchai Bypass at HKCEC, Contract no. HK/2009/02 - Wan Chai
Development Phase II ¡V Central ¡V Wan Chai Bypass at WanChai East and Contract
no. HK/2010/06 Wan Chai Development Phase II ¡V Central-Wan Chai Bypass over MTR
Tsuen Wan Line
5.1.1. The
proposed division of noise monitoring stations are summarized in Table
5.2 below.
Table 5.2 Noise Monitoring Station for Contract nos.
HK/2009/01, HK/2009/02 and HK/2010/06
Station |
Description |
M1a |
Harbour Road Sports Centre |
5.1.2. Daytime
and evening period noise monitoring was conducted at the Harbour Road Sport
Centre in the reporting month.
5.1.3. No exceedance
was recorded in this reporting
period. Details of
noise monitoring results and graphical presentation can be referred in Appendix
5.2
Contract
no. HY/2009/15 - Central-Wanchai Bypass ¡V Tunnel (
5.1.4. The noise
monitoring for HY/2009/15 was commenced on 10 November 2010. The proposed
division of noise monitoring stations are summarized in Table 5.3
below.
Table 5.3 Noise Monitoring Station for Contract no. HY/2009/15
Station |
Description |
M2b |
Noon Gun Area |
M3a |
Tung Lo Wan Fire Station |
5.1.5. Noise
monitoring results measured in the period of daytime and restricted hour are
reviewed and summarized. No exceedance was recorded in this reporting period. Details
of noise monitoring results and graphical presentation can be referred in Appendix
5.2
Contract no. HY/2009/19- Wan Chai Bypass Tunnal
(North Point Section) and Island Eastern Corridor Link
5.1.6. The
proposed division of noise monitoring stations are summarized in Table 5.4
below.
Table 5.4 Noise Monitoring Station for Contract no. HY/2009/19
Station |
Description |
M3a |
Tung Lo Wan Fire Station |
M4b |
Victoria Centre |
M5b |
|
M6 |
HK |
5.1.7. Four limit level exceedances were recorded on 3, 12, 16
and 23 April 2013 at
M6 ¡V HK Baptist Church Henrietta Secondary School in the reporting month.
5.1.8. Major
traffic noise observed during monitoring on 3, 16 and 23 April 2013 and it was
considered as the major noise contribution. As such, the limit level
exceedances were concluded as non-project related.
5.1.9. Breaking
works for pile head under HY/2009/19 were observed during monitoring on 12
April 2013. Despite nearby traffic was observed, it was considered that the
breaking operation was the major noise contribution. As such, the limit level
exceedance was concluded as project related. The temporary noise blanket at
marine platform was confirmed in place and rectification measures including
provision of additional noise blanket at top side of marine pier and reduction
in the number of breakers in parallel use were implemented by the contractor
after exceedance was identified
5.1.10. Noise
monitoring results measured in this reporting period are reviewed and
summarized. Details of noise monitoring results and graphical presentation can
be referred in Appendix 5.2.
Contract no.
HY/2009/19 ¡V Central- Wan Chai Bypass Tunnel (North Point Section) and Island
Eastern Corridor Link
5.2.1 As the land-based piling
and filling works- DP3 at Tin Hau had been completed on 3 September 2012 and
confirmed by RSS, the real-time noise monitoring results at FEHD Hong Kong
Transport Section Whitfield Depot was excluded under EP-356/2009 since 28
November 2012.
5.2.2 The real-time noise
monitoring at RTN2-Oil Street Community Liaison Centre has been relocated to
City Garden Electric Centre (RTN2a- Electric Centre) on 5 Oct 2012, which is a representative
of noise sensitive
5.2.3 The major work activities
for Contract no. HY/2009/11 was confirmed substantial complete by RSS on 4
January 2012. The construction site was handed over to contractor HY/2009/19 on
31 December 2011 and the FEP-01/356/2009 was surrendered on 22 Oct 2012.
5.2.4 No limit level exceedance was recorded at
RTN2a-Electric Centre in this reporting month.
5.2.5 Real-time
noise monitoring at FEHD Hong Kong Transport Section Whitfield Depot commenced
external wall renovation since 1 June 2012
Table 5.5 Real
Time Noise Monitoring Station for Contract no. HY/2009/19
District |
Station |
Description |
Tin Hau |
RTN1 |
FEHD Hong Kong
Transport Section Whitfield
Depot |
North Point |
RTN2 |
Oil Street
Community Liaison Centre |
North Point |
RTN2a |
Electric Centre |
l
Real
time noise monitoring results and graphical presentation during night time
period are for information only.
l
RTN2 had been relocated to RTN2a since 5 Oct 2012
l
RTN1 monitoring had been finished on 28 Nov 2012
5.2.6
Details of real time noise monitoring results
and graphical presentation can be referred to Appendix 5.5.
5.3.1.
Due to extension of site boundary
by contractor of HY/2009/19, location of air monitoring station CMA1b ¡V Oil
Street Community Liaison Centre has been finely adjusted on 21 April 2012.
5.3.2. Due to
lack of electricity supply, the 24hr-TSP monitoring at the following stations
were rescheduled:
CMA1b: from 19 April
2013 to 20 April 2013
CMA3a: from 8 April
2013 to 9 April 2013 and from 25 Apr 2013 to 26 Apr 2013
Contract no. HK/2009/01 - Wan Chai Development
Phase II ¡V Central ¡VWanchai Bypass at HKCEC
5.3.3. Air
monitoring was commenced on 1 April 2011 in response to the commencement of the
land-filling work for Contract no. HK/2009/01. The proposed divisions of air
monitoring stations are summarized in Table 5.7 below. No
exceedance was recorded in the reporting month.
Table 5.7 Air
Monitoring Stations for Contract no. HK/2009/01
Station |
Description |
CMA5a |
Children Playgrounds opposite to |
CMA6a |
WDII PRE Site Office |
5.3.4. One action
level and no limit level exceedances were recorded during 1hr-TSP monitoring on
15 April 2013 at CMA6a ¡V WD2 PRE Office in this reporting month. The exceedances
were concluded as non-project related. After investigation, it was found that
the high ambient air pollutant concentration was the major contribution to air
quality impact and contractor dust mitigation measures were confirmed in place.
As such, the exceedances were considered as non- project related. Air quality
monitoring results measured in this reporting period are reviewed and
summarized. Details of air
monitoring results and graphical presentation can be referred in Appendix
5.3
Contract no. HK/2009/02 - Wan Chai Development
Phase II ¡V Central ¡V Wan Chai Bypass at WanChai East
5.3.5. Air
monitoring was commenced in mid-January 2011 for the land-filling work for
Contract no. HK/2009/02. The proposed division of air monitoring stations are
summarized in Table 5.8 below. No exceedance was
recorded in the reporting month.
Table 5.8 Air
Monitoring Station for Contract no. HK/2009/02
Station |
Description |
CMA4a |
Society for the Prevention of Cruelty to Animals |
Contract
no. HY/2009/15 - Central-Wanchai Bypass ¡V Tunnel (
5.3.6. Air
monitoring was commenced on 15 March 2011 for the land filling work for
Contract no. HY/2009/15. The proposed division of air monitoring stations are
summarized in Table 5.9 below.
Table
5.9 Air
Monitoring Station for Contract no. HY/2009/15
Station |
Description |
CMA3a |
CWB PRE Site
Office |
5.3.7. Two action
level and no limit level exceedances were recorded at CMA3a- CWB PRE Site
Office on 15 April 2013 during 1hr- TSP monitoring in the reporting month.
After investigation, it was found that the high ambient air pollutant
concentration was the major contribution to air quality impact and contractor
dust mitigation measures were confirmed in place. As such, the exceedances were
considered as non- project related. Air quality monitoring results measured in
this reporting period are reviewed and summarized. Details of air monitoring results and
graphical presentation can be referred in Appendix 5.3
Contract
no. HY/2009/19- Wan Chai Bypass Tunnal (North Point Section) and Island Eastern
Corridor Link
5.3.8. The
proposed division of air monitoring stations are summarized in Table 5.10
below. No exceedance was recorded in the reporting month.
Table 5.10 Air Monitoring Stations for Contract no. HY/2009/19
Station |
Description |
CMA1b |
Oil Street Site
Office |
CMA2a |
|
5.3.9.
Two action level and no limit level
exceedances were recorded at CMA1b- Oil Street Site Office on 15 April 2013
during 1hr- TSP monitoring in the reporting month. After investigation, it was
found that the high ambient air pollutant concentration was the major
contribution to air quality impact and contractor dust mitigation measure was
confirmed in place. As such, the exceedances were considered as non- project related.
Air quality monitoring results measured in this reporting period are reviewed
and summarized. Details of air
monitoring results and graphical presentation can be referred in Appendix
5.3.
5.4.1.
With respect
to status of cooling intakes relocation, WQM events on 22 April 2013 at
monitoring stations C2, C3, C4e and C4w were temporarily suspended to confirm
the commissioning status of the relocated pump stations with the WDII RSS and
the IEC for preparation of relocation of the WQM stations to the relocated
cooling intake pump stations
5.4.2.
WDII/RSS advised that the dredging works for submarine pipeline at
5.4.3.
Based on the joint inspection on 4 Jan 2012 for the NPR area, the 4-week
water quality monitoring at WSD9, WSD10, WSD15, WSD17, C8, C9 to confirm no
water deterioration with respect to NPR was commenced since 7 Jan 2012 and it
was completed on 6 February 2012.
5.4.4.
Water quality monitoring at WSD10 and WSD15 was temporary suspended
while water quality monitoring at WSD9 and WSD17 was implemented with respect
to HK/2009/02 from 8 Feb 12 onwards;
5.4.5.
Due to the marine piling under Contract no. HY/2009/19 was completed on
4 March 2013, the temporary suspension of impact water quality monitoring at C8
and C9 from 4 March 2013 have been monitored for 4-week period after the
completion of marine works to confirm no water deterioration.
5.4.6.
Based on the safety concern when external façade refurbishment was
conducted by contractor employed by Provident Centre (C9) since 3 Feb 2012,
there is a fine adjustment of the sampling location of water quality monitoring
at C9 to the closest accessible point prior to the completion of the external façade
refurbishment work.
5.4.7. With respect to the trial dredging at WCR2 was scheduled on
20, 22, 24, 25 March and 1, 3 , 11, 13, 15, 17, 19, 20 Apr and 3 May 2012, on-going water quality monitoring results at WSD21
during this period was checked and indicated that there was no contribution due
to the trial dredging operation. Enhanced review of water quality around
WCR2 was also implemented and no deterioration in the water quality was
observed.
5.4.8. Due to the access of water monitoring station at WSD19 was blocked
by LCSD construction works from 3 April 2012 to 2 May 2012 and lead to the
inaccessibility of sampling either land and marine, there is a fine adjustment
of the sampling point of WSD 19 since 5 April 2012 to the closest accessible
point prior to the completion of the construction activities.
5.4.9. Due to the dredging works for Cross Harbour Water Mains from
Wan Chai to Tsim Sha Tsui- DP6 was completed on 26 March 2012, the temporary
suspension of impact water quality monitoring at WSD7 and WSD20 after 27 April
2012 for the water quality monitoring at WSD7 and WSD20 have been monitored for
4-week period after the completion of DP6 to confirm no water deterioration.
5.4.10.
Due to the presence of obstacle within the inner silt curtain frame at
sampling point, water quality point at C7 was finely adjusted to the outside of
the inner silt curtain frame since 29 Dec 2012.
5.4.11.
As confirmed by CWB RSS, the marine pilling works under contract
HY/2009/19 was confirmed completed by 4 March 2013. The water quality monitoring at the
respective monitoring stations C8 and C9 were temporarily suspended since 30 March
2013.
5.4.12.
With respect
to status of cooling intakes relocation, WQM events on 22 April 2013 at
monitoring stations C2, C3, C4e and C4w were temporarily suspended to confirm
the commissioning status of the relocated pump stations with the WDII RSS and
the IEC for preparation of relocation of the WQM stations to the relocated
cooling intake pump stations.
5.4.13.
Upon confirmation with WDII RSS and the IEC, water quality monitoring at
relocated intakes monitoring location P1, P3, P4 and P5 were commenced since 24
April 2013.
Table 5.11 Water Monitoring Stations for contracts
with respect to remaining DP3
work areas after the completion of DP5
& DP6 in 2012 and intake diversion in 2013
Contract No. |
Remaining DP3 and work area(s) |
Relevant Water Monitoring Stations, |
Division of WQM w.r.t tentative works commenced / to be commenced |
HK/2009/01 |
WCR3 |
C11 |
Apr 2013 |
HK/2009/02 |
WCR3, WCR4, TWCR4 |
RW21-P7891 |
Apr 2013 |
HK/2012/08 |
HKCEC2W, HKCEC2E |
WSD19, P13, P33, P43, P53 |
Aug 2013 |
HY/2009/15 |
TCBR2, TCBR3, TCBR1W, TPCWAE, TPCWAW |
C64, C7, Ex-WPCWA SW, Ex-WPCWA SE (plus enhanced DO monitoring
described in 4.6.3) |
Nov 2010 |
HY/2010/08 |
TCBR3, TCBR4 |
C64, C7 (plus enhanced DO monitoring described in 4.6.3) |
Mar 2014 |
Remarks:
-The water monitoring stations for WSD19, P1, P3, P4, P5 shall be associated with Contract No. HK/2009/01 prior to their transition to Contract HK/2012/08.
-4 intakes (re-provisioned Wanchai WSD intake, Great Eagle Centre, China Resources Centre & Sun Hung Kai Centre constructed adjacent to each other) taken as a single group for silt screen protection and monitoring.
-Re-provisioned intake
reference: P1: HKCEC Phase 1; P3: APA, P4: Shui On; P5:
-Enhanced DO Monitoring at
C6 since the intake abandon in May 2011.
Contract no. HK/2009/01 - Wan Chai Development
Phase II ¡V Central ¡VWanchai Bypass at HKCEC
5.4.14. Water
monitoring for Contract no. HK/2009/01 was commenced on 23 July 2010. The
proposed division of water monitoring stations are summarized in Table
5.12 below.
Table 5.12 Water
Monitoring Stations for Contract no. HK/2009/01
Station
Ref. |
Location |
Easting |
Northing |
WSD Salt Water Intake |
|||
WSD7 |
|
834150.0 |
818300.3 |
WSD19 |
Sheung Wan |
833415.0 |
816771.0 |
WSD20 |
|
830750.6 |
816030.3 |
Cooling Water Intake |
|||
C1 |
HKCEC Extension |
835885.6 |
816223.0 |
C2 |
Telecom
House |
835647.9 |
815864.4 |
C3 |
HKCEC Phase
I |
835836.2 |
815910.0 |
C4e |
Great Eagle
Centre |
835932.8 |
815888.2 |
C4w |
Wan |
835629.8 |
815889.2 |
P1 |
HKCEC Phase I |
835774.7 |
816179.4 |
P3 |
The |
835824.6 |
816212.0 |
P4 |
Shui on Centre |
835865.6 |
816220.0 |
P5 |
Government Buildings ( |
835895.2 |
816215.2 |
Remarks:
- The
water monitoring stations for the dredging works under Contract No. HK/2009/01
should also include WSD9, WSD17, WSD 21 and C5 if water quality monitoring at
these locations have not been carried out by others. Similarly, the water
monitoring stations for the dredging works under Contract No. HK/2009/02 should
also include WSD7, WSD9, WSD17, WSD 19, C1, C2, C3 and C4 if water quality
monitoring at these locations have not been carried out by others.
- WSD7 and WSD20 water
quality monitoring were temporarily suspended since 27 Apr 2012.
Contract no. HK/2009/02 - Wan Chai Development Wan
Chai Development Phase II ¡V Central ¡V Wan Chai Bypass at WanChai East
5.4.15. Water
monitoring for Contract no. HK/2009/02 was commenced on 8 July 2010. The
proposed division of water monitoring stations are summarized in Table
5.13 below.
Table 5.13 Water
Monitoring Stations for Contract no. HK/2009/02
Station
Ref. |
Location |
Easting |
Northing |
|||
WSD Salt Water Intake |
||||||
WSD21 |
Wan Chai |
836220.8 |
815940.1 |
|||
WSD9 |
Tai Wan |
837921.0 |
818330.0 |
|||
WSD17 |
|
839790.3 |
817032.2 |
|||
Cooling Water Intake |
||||||
C5e |
Sun Hung
Kai Centre (Eastern) |
836250.1 |
815932.2 |
|||
C5w |
Sun Hung
Kai Centre (Western) |
836248.1 |
815933.2 |
|||
Remarks:
-
The
water monitoring stations for the dredging works under Contract No. HK/2009/01
should also include WSD9, WSD17, WSD 21 and C5 if water quality monitoring at
these locations have not been carried out by others. Similarly, the water
monitoring stations for the dredging works under Contract No. HK/2009/02 should
also include WSD7, WSD9, WSD17, WSD 19, C1, C2, C3 and C4 if water quality
monitoring at these locations has not been carried out by others.
-
Water
quality monitoring at WSD9 and WSD 17 was implemented with respect to
HK/2009/02 from 8 Feb 2012.
Contract
no. HK/2010/06 - Wan Chai Development Phase II ¡V Central ¡VWanchai Bypass over
MTR Tsuen Wan Line
5.4.17. Water
monitoring for Contract no. HK/2010/06 was commenced on 8 March 2011. The
proposed division of water monitoring stations are summarized in Table
5.14 below.
Table 5.14 Water
Monitoring Stations for Contract no. HK/2010/06
Station
Ref. |
Location |
Easting |
Northing |
Cooling Water Intake |
|||
C2 |
Telecom
House |
835647.9 |
815864.4 |
P1 |
HKCEC Phase I |
835774.7 |
816179.4 |
Contract
no. HY/2009/15 - Central-Wanchai Bypass ¡V Tunnel (
5.4.18. As the removal of reclamation work
of TS1 at CBTS has been completed, all procedures have been rectified and
complied with the conditions set in EP-356/2009 and FEP-04/356/2009.
5.4.19.
Due to the commencement of the maintenance dredging on 10 November 2010,
water quality monitoring for Contract no. HY/2009/15 was commenced on 9
November 2010. The proposed division of water monitoring stations are
summarized in Table 5.15 below.
5.4.20.
Due to the presence of obstacle within the inner silt curtain frame at
sampling point, water quality point at C7 was finely adjusted to the outside of
the inner silt curtain frame since 29 Dec 2012.
Table
5.15 Water Monitoring
Stations for Contract no. HY/2009/15
Station
Ref. |
Location |
Easting |
Northing |
Cooling Water Intake |
|||
C6 |
Excelsior Hotel |
837009.6 |
815999.3 |
C7 |
|
837193.7 |
816150.0 |
Remarks: - The cessation of seawater intake operation
for C6 was confirmed on 17 May 2011, the water monitoring at C6 was then
terminated since 17 May 2011.
Contract no. HY/2009/19 ¡V Central- Wan Chai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
5.4.21. Due to the
commencement of the marine bored piling on 28 Jan 2012, water quality monitoring
for Contract no. HY/2009/19 was commenced on 28 Jan 2012. The proposed division
of water monitoring stations are summarized in Table 5.16 below.
Table 5.16 Water
Monitoring Stations for Contract no. HY/2009/19
Station
Ref. |
Location |
Easting |
Northing |
Cooling Water Intake |
|||
C8 |
|
837970.6 |
816957.3 |
C9 |
Provident Garden |
838355.0 |
817116.6 |
Remarks: C8 and C9 monitoring commenced on 28 Jan 2012 and suspended on 30 March 2013.
5.4.23.
Based on the safety concern when external façade refurbishment was
conducted by contractor employed by Provident Center (C9) between 9 January
2012 to 30 July 2012 which caused to the inaccessibility of sampling either
land and marine since 3 Feb 2012, there is a fine adjustment of the sampling
location of water quality monitoring at C9 since 10 March 2012 to the closest
accessible point prior to the completion of the external façade refurbishment
work.
5.4.24.
Due to the access of water monitoring station at WSD19 was blocked by
LCSD construction works from 3 April 2012 to 2 May 2012 and lead to the
inaccessibility of sampling either land and marine, there is a fine adjustment
of the sampling point of WSD 19 since 5 April 2012 to the closest accessible
point prior to the completion of the construction activities.
5.4.25.
As per the meeting with the representative of Excelsior Hotel and World
Trade Centre on 17 May 2011, they confirmed that the seawater intake for The
Excelsior was no longer in use and replaced by the connected permanent water
supply from WSD pipelines since 11 January 2011. Thus, the impact water quality
monitoring for the cooling intake - C6 was terminated effective from 26 May
2011.
5.4.26.
24 hours
monitoring of turbidity at the cooling water intakes at C7 was conducted. With respect to the seawall collapsing at TS4 on 17 November 2011, the
24 hours turbidity monitoring and was kept in November 2011. Since the reinstating the seawall
was completed on 13 January 2012 and no any water deterioration was performed,
24 hour turbidity monitoring was then suspended on 27 January 2012.
5.4.27. Water
monitoring results measured in this reporting period are reviewed and
summarized. Details of water quality monitoring results and graphical
presentation can be referred in Appendix
5.4.
Table
5.17 Summary of Water Quality
Monitoring Exceedances in Reporting Month
Contract no. |
Water Monitoring Station |
Mid-flood |
Mid-ebb |
|||||||||||
DO |
Turbidity |
SS |
DO |
Turbidity |
SS |
|||||||||
|
LL |
|
LL |
|
LL |
|
LL |
|
LL |
|
LL |
|||
HK/2009/01 |
WSD19 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
3 |
1 |
2 |
|
|
C1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
C3 |
0 |
5 |
0 |
0 |
0 |
0 |
0 |
5 |
0 |
0 |
0 |
0 |
|
|
C4e |
0 |
5 |
0 |
0 |
1 |
0 |
0 |
4 |
0 |
1 |
0 |
0 |
|
|
C4w |
1 |
3 |
0 |
0 |
1 |
0 |
1 |
4 |
0 |
0 |
0 |
0 |
|
P1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
P3 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
P4 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
P5 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
Monitoring
finished on 27 April 2012 |
WSD20 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
WSD7 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
HK/2009/01 & HK/2010/06 |
C2 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
HK/2009/02 |
C5e |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
C5w |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
Monitoring started
on 8 Feb 2012 |
WSD21 |
0 |
0 |
0 |
0 |
2 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
WSD9 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
|
WSD17 |
0 |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
HY/2009/15 |
C7 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
HY/2009/19 Monitoring started on 28 Jan 2012 |
C8 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
C9 |
0 |
0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
Total |
1 |
13 |
1 |
0 |
5 |
0 |
1 |
13 |
1 |
4 |
1 |
2 |
||
Remarks: - The cessation of seawater intake operation for C6 was confirmed on 17 May 2011, the water monitoring at C6 was then terminated since 17 May 2011.
- WSD9 and WSD17 were implemented with respect to HK/2009/02 from 8 Feb 2012.
-
4-week water quality monitoring at WSD9, WSD10, WSD15, WSD17, C8, C9
were completed on 6 Feb 2012.
- C8 and C9 were
implemented with respect to HY/2009/19 from 28 Jan 2012.
- C8
& C9 was temporary suspended on 30 March 2013 due to the marine works for
Contract no. HY/2009/19 had been completed on 4 March 2013
- WSD7 and WSD20 were
temporarily suspended from 27 Apr 2012
5.4.28.
Investigation revealed that exceedances from 8 to 12 April 2013 at C3,
C4e and C4w were project-related exceedances. All the other remaining
exceedances were concluded as non-project-related. The details of the recorded
exceedances can be referred to the Section 6.4.
5.4.29.
Enhanced DO monitoring at 4 monitoring stations in Causeway Bay Typhoon
Shelter and Ex-Public Cargo Works Area was conducted three days per week during
the reporting period. The action and limit level exceedances of water quality
monitoring are summarized in Table 5.18.
Table 5.18 Summary
of Enhanced Dissolved Oxygen Monitoring Exceedances in Reporting Month
Water Monitoring Station |
Mid-flood |
Mid-ebb |
|||
DO |
DO |
||||
|
LL |
|
LL |
||
HY/2009/15 |
C6 |
0 |
0 |
0 |
0 |
C7 |
0 |
0 |
0 |
0 |
|
Ex-WPCWA SW |
0 |
0 |
1 |
1 |
|
Ex-WPCWA SE |
0 |
0 |
2 |
0 |
|
Total |
0 |
0 |
3 |
1 |
5.4.30. There were
3 action level exceedances and 1 limit level exceedances recorded in enhanced
dissolved oxygen monitoring in this reporting period.
5.4.31.
In response to the Condition 2.18 of the Environmental Permit no.
EP-356/2009 requiring that a silt curtain / impermeable barrier system be
installed to channel water discharge flow from Culvert L to locations outside
the embayment area, a proposed replacement of the requirement with additional
dissolved oxygen monitoring has been conducted at three monitoring stations,
namely A, B and C between the eastern seawall of Central Reclamation Phase III
and the HKCEC Extension since November 2011 under EP-356/2009 so that DO level
between the eastern seawall of Central Reclamation Phase II and the HKCEC
extension could be continuously monitored. Details of additional DO monitoring results
can be referred in Appendix
5.4a.
Contract no. HK/2009/01 - Wan Chai Development
Phase II ¡V Central ¡VWanchai Bypass at HKCEC
5.5.1. Inert
C&D waste was disposed and no non- inert C&D waste was recycled of in
this reporting month. Details of the waste flow table are summarized in Table
5.19.
Table 5.19 Details of Waste Disposal for Contract no. HK/2009/01
Waste Type |
Quantity this month |
Cumulative Quantity-to-Date |
Disposal / Dumping Grounds |
Inert C&D materials disposed, m3 |
117.40 |
22379.215 |
TKO137, TM38 |
Inert C&D materials recycled, m3 |
0 |
5104.5 |
N/A |
Non-inert C&D materials disposed, m3 |
17.16 |
1280.8 |
|
Non-inert C&D materials recycled, kg |
0 |
151143 |
N/A |
Chemical waste disposed, kg |
100 |
9300 |
N/A |
*Marine Sediment (Type 1 ¡V Open Sea Disposal), m3 |
0 (Bulk Volume) |
97428.2 (Bulk Volume) |
South of Cheung Chau |
* Marine Sediment (Type 1 ¡V Open Sea Disposal (Dedicate Sites)
& Type 2 ¡V Confined Marine Disposal) , m3 |
0 (Bulk Volume) |
52250 (Bulk Volume) |
East of Cha Chau |
Dredged Sediment Requiring Type 3
¡V Special Treatment / Disposal contained in Geosynthetic Containers |
0 (Bulk Volume) |
6773 (Bulk Volume) |
East of Cha Chau |
5.5.2. There were
no marine sediment Type 1- Open Sea Disposal and marine sediments Type 1 ¡V Open Sea Disposal (Dedicate
Sites) & Type 2 ¡V Confined Marine Disposal disposed in this reporting month.
Contract no. HK/2009/02 - Wan Chai Development
Phase II ¡V Central ¡V Wan Chai Bypass at Wan Chai East
5.5.3. Inert
C&D waste and Non-inert C&D waste were disposed of in this reporting
month. Details of the waste flow table are summarized in Table 5.20.
Table
5.20 Details of
Waste Disposal for Contract no. HK/2009/02
Waste Type |
Quantity this month |
Cumulative Quantity-to-Date |
Disposal / Dumping Grounds |
Inert C&D materials disposed, m3 |
795.2 |
231688.18 |
TKO137 / TM 38 |
Inert C&D materials recycled, m3 |
NIL |
18161 |
N/A |
Non-inert C&D materials disposed, m3 |
30.07 |
862.19 |
SENT Landfill |
Non-inert C&D materials recycled,
m3 |
N/A |
N/A |
N/A |
Chemical waste disposed, kg |
700 |
6736 |
SENT Landfill |
Marine Sediment (Type 1 ¡V Open Sea Disposal), m3 |
27254 |
182081 (Bulk volume) |
South of Cheung Chau |
Marine Sediment (Type 1 ¡V Open Sea Disposal (Dedicate Sites) & Type 2 ¡V Confined
Marine Disposal) , m3 |
5016 |
129320 (Bulk volume) |
East of Sha Chau |
There are marine Sediment Type1- Open Sea
Disposal and there are Type 1 ¡V Open Sea Disposal (Dedicate Sites) & Type 2
¡V Confined Marine Disposal was disposed of in this reporting month.
Contract no. HY/2009/15 - Central-Wanchai Bypass ¡V
Tunnel (
5.5.4. No Inert
C&D waste and no non- inert C&D waste were disposed of in this
reporting month. Details of the waste flow table are summarized in Table
5.21
Table 5.21 Details of Waste Disposal for Contract no. HY/2009/15
Waste Type |
Quantity this month |
Cumulative Quantity-to-Date |
Disposal / Dumping Grounds |
Inert C&D materials disposed, m3 |
NIL |
141579.2 |
Tuen Mun Area 38 |
NIL |
65216 |
TKO137 FB |
|
Inert C&D materials recycled, m3 |
NIL |
304 |
ex-PCWA |
NIL |
111.9 |
TS4 |
|
Non-inert C&D materials disposed, m3 |
NIL |
252.2 |
SENT Landfill |
Non-inert C&D materials recycled, kg |
NIL |
299361.5 |
N/A |
Chemical waste disposed, kg |
NIL |
8,200 |
N/A |
Marine Sediment (Type 1 ¡V Open Sea Disposal),
m3 |
0 (Bulk Volume) |
100208 (Bulk Volume) |
South of Cheung Chau |
Marine Sediment (Type 1 ¡V Open Sea Disposal (Dedicate Sites) & Type 2 ¡V Confined Marine
Disposal) , m3 |
0 (Bulk Volume) |
218665 (Bulk Volume) |
East of Sha Chau |
Marine Sediment (Type 3 ¡V Special Treatment / Disposal
contained in Geosynthetic Containers) |
NIL |
7,050 (Bulk Volume) |
East
of Sha Chau |
Marine Sediment (Type 2 ¡V Confined Marine Disposal), m3 |
5240 (Bulk Volume) |
6100 (Bulk Volume) |
East of Sha Chau |
There was no marine sediment Type 1 Open Sea Disposal (Dedicate Sites) & Type 2 ¡V
Confined Marine Disposal was disposed of in this
reporting month.
Contract no. HK/2010/06 - Wan Chai Development
Phase II ¡V Central ¡V Wan Chai Bypass over MTR Tsuen Wan Line
5.5.5. Inert C&D
waste was disposed and no non-Inert C&D waste was recycled in this reporting
month. Details of the waste flow table are summarized in Table 5.22.
Table 5.22 Details of Waste Disposal for Contract no. HK/2010/06
Waste Type |
Quantity this month |
Cumulative Quantity-to-Date |
Disposal / Dumping Grounds |
Inert C&D materials disposed, m3 |
165 |
12081.4 |
TM38 |
Inert C&D materials recycled, m3 |
NIL |
267 |
HK/2009/01 |
Non-inert C&D materials disposed, m3 |
25.47 |
161.95 |
SENT/TKO137SF |
Non-inert C&D materials recycled, T |
NIL |
60.58 |
Recyclers |
Chemical waste disposed, L |
0 |
2200 |
N/A |
Marine Sediment (Type 1 ¡V Open Sea Disposal), m3 |
0 |
3,891 (Bulk Volume) |
South Cheung Chau |
Marine Sediment (Type 1 ¡V Open Sea Disposal (Dedicate Sites) &
Type 2 ¡V Confined Marine Disposal) , m3 |
0 |
12,586 (Bulk Volume) |
|
There was no marine sediments Type1-
Open Sea Disposal and no Type 1 ¡V Open Sea Disposal (Dedicate Sites)
& Type 2 ¡V Confined Marine Disposal was deposed of in this
reporting month.
Contract no. HY/2009/19 ¡VCentral- WanChai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
5.5.6. Inert
C&D waste was disposed of and non-inert C&D waste were disposed and recycled
in this reporting month. Details of the waste flow table are
summarized in Table 5.23.
Table 5.23 Details of Waste Disposal for Contract no. HY/2009/19
Waste Type |
Quantity this month |
Cumulative Quantity-to-Date |
Disposal / Dumping Grounds |
Inert C&D materials disposed, m3 |
8568.69 |
177096.81 |
TM38 |
Inert C&D materials recycled, m3 |
17930.45 |
19253.45 |
N/A |
Non-inert C&D materials disposed, m3 |
14.92 |
314.83 |
N/A |
Non-inert C&D materials recycled, kg |
37.32 |
224.77 |
N/A |
Chemical waste disposed, L |
0 |
0.46 |
N/A |
Marine Sediment (Type 1 ¡V Open Sea Disposal), m3 |
0 |
83 |
South Cheung Chau |
Marine Sediment (Type 1 ¡V Open Sea Disposal (Dedicate Sites) &
Type 2 ¡V Confined Marine Disposal) , m3 |
0 |
681 |
|
There was no marine
sediment Type1- Open Sea Disposal and there was no Type
1 ¡V Open Sea Disposal (Dedicate Sites) & Type 2 ¡V Confined Marine Disposal generated were disposed in
this reporting month.
6.0.1. The Event
Action Plan for construction noise, air quality and water quality are presented
in Appendix 6.1.
Contract no. HK/2009/01 - Wan Chai Development Phase II ¡V Central
¡VWanchai Bypass at HKCEC
6.1.1 No
exceedance was recorded in the reporting month.
Contract no.
HK/2009/02 - Wan Chai Development Phase II ¡V Central ¡V Wan Chai Bypass at
WanChai East
6.1.2 No
exceedance was recorded in the reporting month.
Contract no.
HY/2009/15 - Central-Wanchai Bypass ¡V Tunnel (
6.1.3 No
exceedance was recorded in the reporting month.
Contract no.
HK/2010/06 - Wan Chai Development Phase II ¡V Central ¡VWanchai Bypass over MTR
Tsuen Wan Line
6.1.4
No exceedance was recorded in the reporting
month.
Contract no.
HY/2009/19 ¡V Central ¡V Wanchai Bypass Tunnel (North Point Section) and Island
Eastern Corridor Link
6.1.5
Four limit level
exceedances were recorded on 3, 12, 16 and 23 April 2013 at
M6 ¡V HK Baptist Church Henrietta Secondary School in the reporting month. Investigations found that on 3, 16 and 23
April 2013, major traffic noise was contributed in the noise monitoring
and exceedances were not related to the Project. On 12 April 2013, investigation
found that breaking works operation was the major noise contribution despite
nearby IEC traffic and the exceedance was considered as Project-related.
6.2.1 Non
project related limit level exceedance was recorded at RTN2a- Electric Centre
on 28 March 2013. Investigation found that exceedances were contributed by IEC
traffic.
Contract no. HK/2009/01 - Wan Chai Development Phase II ¡V Central
¡VWanchai Bypass at HKCEC
6.3.1 One action
level and no limit level exceedances were recorded during 1hr-TSP monitoring on
15 April 2013 at CMA6a ¡V WD2 PRE Office in this reporting month. The exceedances
were concluded as non-project related. After investigation, it was found that
the high ambient air pollutant concentration was the major contribution to air
quality impact and contractor dust mitigation measures were confirmed in place.
As such, the exceedances were considered as non- project related.
Contract no.
HY/2009/15 - Central-Wanchai Bypass ¡V Tunnel (
6.3.2 Two action
level exceedances were recorded at CMA3a- CWB PRE Site Office on 15 April 2013
during 1hr-TSP monitoring in the reporting month. Ambient air pollutant
concentration was considered as the contribution to air quality impact. As
such, the exceedances were concluded as non project related.
Contract no. HY/2009/19 ¡V Central ¡V Wanchai Bypass Tunnel (North Point
Section) and Island Eastern Corridor Link
6.3.3 Two action
level exceedances were recorded at CMA1b- Oil Street Site Office on 15 April
2013 during 1hr-TSP monitoring in the reporting month. Ambient air pollutant
concentration was considered as the contribution to air quality impact. As
such, the exceedances were concluded as non project related.
Contract no. HK/2009/01 - Wan Chai Development Phase II ¡V Central
¡VWanchai Bypass at HKCEC
6.4.1 There was SS
exceedence at C4e recorded during flood tide on 29 Mar 2013 in this reporting
month. According to the information reported by Contractor HK/2009/01 on 29 Mar
2013, rock filling work on east bridge was conducted on that day. Checking with
contractor's inspection record, the silt screen and silt curtain were in proper
condition on that day. In the view that the silt screen and silt curtain were
in proper condition, it was considered not related to Project works.
6.4.2 There was
turbidity exceedence at C9 recorded during flood tide on 29 Mar 2013 in this
reporting month. According to the information reported by Contractor HY/2009/19
on 29 Mar 2013, no related marine work was performed during time of monitoring,
the exceedance was considered to be caused from the accumulation of particles
discharged from the outfalls near monitoring station and not related to the
Project works.
6.4.3 There was
DO exceedence at C4w recorded during ebb tide on 5 April 2013 in this reporting
month. According to the information reported by Contractor HK/2009/01 on 5
April 2013, rock filling work on east bridge and backfilling at Victoria Habour
were conducted on that day. Checking with contractor's inspection record, the
silt screen and silt curtain were in proper condition on that day. In view that
the water quality at monitoring stations located nearest the marine work site
were well below the Action level, the silt screen and silt curtain were in
proper condition, it was considered not related to Project works.
6.4.4 There was
DO exceedence at C3, C4e and C4w recorded during both flood and ebb tide on 8 April
2013 in this reporting month. Deterioration of water circulation within the
water channel underneath HKCEC resulted from partial blockage of water flow at
HKCEC3E was observed and was considered as the major contribution of the low DO
level recorded. The Contractor, RE and IEC were informed when the exceedances
were recorded. ET recommended the contractor to clear the partial blockage and
implement appropiate mitigation measures to restore the water quality (DO) at
the concerned area. Upon
considering the exceedance is related to the Project, the filling works at
HKCEC3E was suspended on 13 April 2013. Mitigation measures including provision
of water pump and opening of silt curtain enclosure at the concerned area which
block the water circulation without adversely impact nearby water quality. The
effectiveness of the mitigation measure is closely reviewed at the concerned
area and the trend of DO is closely monitored. Rock filling at East side of
6.4.5 There was
DO exceedence at C3, C4e and C4w recorded during both flood and ebb tide on 10
April 2013 in this reporting month. Deterioration of water circulation within
the water channel underneath HKCEC resulted from partial blockage of water flow
at HKCEC3E was observed and was considered as the major contribution of the low
DO level recorded. The Contractor, RE and IEC were informed when the
exceedances were recorded. ET recommended the contractor to suspend the filling
work at HKCEC3E, clear the partial blockage and implement appropiate mitigation
measures to restore the water quality (DO) at the concerned area. Upon considering the
exceedance is related to the Project, the filling works at HKCEC3E was
suspended on 13 April 2013. Mitigation measures including provision of water
pump and opening of silt curtain enclosure at the concerned area which block
the water circulation without adversely impact nearby water quality. The
effectiveness of the mitigation measure is closely reviewed at the concerned
area and the trend of DO is closely monitored. Backfilling works at Victoria
Habour was conducted by contract HK/2009/01 on 10 April 2013. The partial
blockage of water flow leading to the deterioration of water circulation was
considered as the major contribution of the low DO level. Continous low DO
level was hence recorded and the exceedance was considered as project related.
The trend of water quality ( DO) was closely monitored on 12 Apr 2013.
6.4.6 There was
DO exceedence at C3, C4e and C4w recorded during both flood and ebb tide on 12
April 2013 in this reporting month. Deterioration of water circulation within
the water channel underneath HKCEC resulted from partial blockage of water flow
at HKCEC3E was observed and was considered as the major contribution of the low
DO level recorded.The Contractor, RE and IEC were informed when the exceedances
were recorded. A water pump was provided by the contractor at the water intake
wells underneath HKCEC. ET recommended the contractor to suspend the filling
work at HKCEC3E, clear the partial blockage and review the mitigation measures
implemented to restore the water quality (DO) at the concerned area. Upon
considering the exceedance is related to the Project, the filling works at
HKCEC3E was suspended on 13 April 2013. Mitigation measures including provision
of water pump and opening of silt curtain enclosure at the concerned area which
blocks the water circulation without adversely impact nearby water quality. The
effectiveness of the mitigation measure is closely reviewed at the concerned
area and the trend of DO is closely monitored. Rock
filling at east side of
6.4.7 There was
DO exceedence at C3, C4e and C4w recorded during both flood and ebb tide on 15
April 2013 in this reporting month.
Accumulation of pollutant dishcarged from nearby outfall at the water
channel was observed and was considered as the major contribution of the low DO
level recorded. The Contractor, RE and IEC were informed when the exceedances
were recorded. Filling work at HKCEC3E
(Area 8 & 9) was
suspended since 13 April 2013. Water pump was provided by the contractor at the
water intake wells underneath HKCEC. The partial bloackage of water flow at
HKCEC3E was improved by opening up part of the silt curtain enclosure which
block the water circulation without adversely impacting nearby water quality. ET
recommended the contractor to review the effectiveness of the mitigation
measures and take action to further enhance the dispersion of the accumulated
substances discharged from nearby outfall to restore the water quality (DO) at
the concerned area. No further filling work was conducted by contract
HK/2009/01 since 13 April 2013. The accumulation of outfall discharge within
the water channel underneath the HKCEC was considered as the major contribution
of the exceedance. As such , the exceedance was considered non-project related.
6.4.8 There was
DO exceedence at C3, C4e and C4w recorded during both flood and ebb tide on 17
April 2013 in this reporting month.
Accumulation of dishcarge from nearby outfall and DO depleted waterbody
at the water channel were observed and was considered as the major contribution
of the low DO level recorded. The
Contractor, RE and IEC were informed when the exceedances were recorded.
Filling work at HKCEC3E (Area 8 & 9) was suspended since 13 April 2013.
Water pump and additional re-areation pump were provided by the contractor at
the water intake wells underneath HKCEC and opening of the silt curtain
enclosure was maintained enclosure to minimize the effect of partial bloackage
to water flow without adversely impacting nearby water quality. Persistent low DO level was
recorded despite the implementation of the aforesaid mitigation measures, ET
recommended the contractor to further review the effectiveness of mitigation
measures and provide additional mitigation measures to enhance the dispersion
of the accumulated discharge and DO depleted waterbody from nearby outfall to
restore the water quality (DO) at the concerned area. Persistent low DO level was recorded despite
the implementation of the aforesaid mitigation measures, ET recommended the
contractor to further review the effectiveness of mitigation measures and
provide additional mitigation measures to enhance the dispersion of the accumulated
discharge and DO depleted waterbody from nearby outfall to restore the water
quality (DO) at the concerned area.
6.4.9 There was
DO exceedence at C3, C4e and C4w recorded during both flood and ebb tide on 19
April 2013 in this reporting month.
Accumulation of dishcarge from nearby outfall and DO depleted waterbody
at the water channel were observed and was considered as the major contribution
of the low DO level recorded. The
Contractor, RE and IEC were informed when the exceedances were recorded.
Filling work at HKCEC3E (Area 8
& 9) was suspended since 13
April 2013. Water pump and aeration pump were provided by the contractor at the
water intake wells underneath HKCEC to further enahnce DO and opening of the
silt curtain enclosure was maintained enclosure to minimize the effect of
partial bloackage to water flow without adversely impacting nearby water
quality. Persistent
low DO level was recorded despite the implementation of the aforesaid
mitigation measures, the contractor was advised to review and promtly provide
additional mitigation measures to enhance the dispersion of the accumulated
discharge and DO depleted waterbody at the water channel to restore the water
quality (DO) at the concerned area.
No further filling work was conducted by contract HK/2009/01 since 13
April 2013. The accumulation of outfall discharge within the water channel
underneath the HKCEC was observed amd considered to continously contribute to
the exceedance. As such , the exceedance was considered non-project related.
6.4.10 There were
turbidity and SS exceedances at WSD19 recorded during Ebb tide on 8, 12, 24 and
27 April 2013. In view that the water quality at monitoring stations located
nearest the marine work site were well below Action Level and the silt screen
was in proper condition, the exceedances were possible in relation to the
changes of water quality in the vicinity of the water quality monitoring
station and not project related.
Contract no. HK/2009/02 - Wan Chai
Development Phase II ¡V Central ¡V Wan Chai Bypass at WanChai East
6.4.11 There were
SS exceedances recorded at WSD21 on 1 and 3 April 2013 during flood tide. Confirmed
with Contractor, there was no marine work conducted during the water quality
monitoring. The exceedance was considered as natural variation or changes of water
quality in the vicinity of the water quality monitoring station and not project
related.
6.4.12 There was
SS exceedance recorded at WSD17 on 27 April 2013 during flood tide. Confirmed
with Contractor, there was no marine work conducted during the water quality
monitoring. The exceedance was considered as natural variation or changes of
water quality in the vicinity of the water quality monitoring station and not
project related.
Contract no. HY/2009/15 - Central-Wanchai
Bypass ¡V Tunnel (
6.4.13 There were
occasionally DO exceedances at Ex-WPCWA SE and Ex-WPCWA SW recorded in this
reporting month. No odour nuisance was noted during DO monitoring. After
checking with Contractor, there was no marine work undertaken at ex-WPCWA. The
exceedances were possible in relation to the accumulation of organic particles
discharge from culvert near monitoring station and considered not related to
the Projects works.
Contract no. HK/2010/06 - Wan Chai
Development Phase II ¡V Central ¡VWanchai Bypass over MTR Tsuen Wan Line
6.4.14 No
exceedance was recorded in this reporting month.
Contract no. HY/2009/19- Central- Wan Chai
Bypass Tunnel (North Point Section) and Island Eastern Corridor Link
6.4.15 There were
occasionally turbidity and turbidity exceedances at C9 recorded on 29 Mar 2013 in
this reporting month. Confirmed with Contractor, there was no marine work conducted
near C9.The exceedances was possible in relation to the accumulation of
particles discharged from outfalls near monitoring stations and not related to
project.
6.4.16 Summary
for notification of exceedances can be referred to Appendix 6.2.
6.5.1 There was
no non-compliance from the site audits in the reporting period. The
observations and recommendations made in each individual site audit session
were presented in Section 8.
6.5.2 One
project related exceedances from noise monitoring was recorded in the reporting
month.
6.5.3 One
project related exceedances from water monitoring was recorded in the reporting
month.
6.6.1 There was
no particular action taken since no non-compliance was recorded from the site
audits in the reporting period.
6.6.3 Following
the Event and Action Plan, additional noise monitoring was conducted on 15
April 2013 and a proposal for remediation measures was submitted by the
contractor after the exceedance was identified.
6.6.4 The
temporary noise blanket at marine platform was confirmed in place and rectification
measures including provision of additional noise blanket at top side of marine
pier and reduction in the number of breakers in parallel use were implemented
by the contractor.
6.6.5 There was
DO exceedence at C3, C4e and C4w recorded during both flood and ebb tide from 8
to 12 April 2013 in this reporting month. Deterioration of water circulation
within the water channel underneath HKCEC resulted from partial blockage of
water flow at HKCEC3E was observed and was considered as the major contribution
of the low DO level recorded.
6.6.6 The
Contractor, RE and IEC were informed when the exceedances were recorded. A
water pump was provided by the contractor at the water intake wells underneath
HKCEC. ET recommended the contractor to suspend the filling work at HKCEC3E,
clear the partial blockage and review the mitigation measures implemented to
restore the water quality (DO) at the concerned area.
6.6.7 Upon
considering the exceedance is related to the Project, the filling works at
HKCEC3E was suspended on 13 April 2013. Mitigation measures including provision
of water pump and opening of silt curtain enclosure at the concerned area which
blocks the water circulation without adversely impact nearby water quality.
6.6.8 The
effectiveness of the mitigation measure is closely reviewed at the concerned
area and the trend of DO is closely monitored. Rock filling at east side of
7.0.1. According
to Condition 3.4 of the EP-356/2009, this section addresses the relevant
cumulative construction impact due to the concurrent activities of the current
projects including the Central Reclamation Phase III, Central-Wanchai Bypass
and Island Eastern Corridor Link projects.
7.0.2. According
to the Monthly EM&A report (March 2013) of Central Reclamation Phase III
(CRIII), filling works, road works, landscape works, building construction
works and drainage works were performed in the April 2013 reporting month. The
water quality monitoring was completed in October 2011 and no Project-related exceedance
was recorded for air and noise monitoring.
It can be concluded that cumulative construction impact due to the
concurrent activities of the current projects with the Central Reclamation
Phase III (CRIII) was insignificant
7.0.3.
According to the construction programme of
Wan Chai Development Phase II, Central-Wan Chai Bypass and Island Eastern
Corridor Link projects, the major construction activity under Wan Chai
Development Phase II were marine works at HKCEC areas, cross-harbour
Watermains, Fresh Watermains and Cooling Watermains Installations, tunnel works
at Wan Chai East, ELS work at TS4 and deep excavation at TPCWAE TCBR1W. Excavation
and tunnel works at Central Interchange, ELS and box culvert construction at
North Point area. The major environmental impact was water quality impact at
7.0.4. The major
environmental impacts generated from tunnel works at Central and tunnel works
at Wan Chai East, IECL and Causeway Bay Typhoon Shelter were undertaken in the
reporting month. No significant air impact was anticipated in the reporting
month. Besides, no project-related exceedances were recorded during the air environmental
monitoring events in the reporting month. There was one project related limit
level exceedances during noise monitoring event in the reporting month and
rectification measures have been implemented by contractor. There was project
related limit level exceedances during water quality monitoring event in the
reporting month and rectification measures have been implemented by contractor.
Thus, it is evaluated that the cumulative construction impact from the
concurrent projects including Wan Chai Development Phase II was insignificant.
8.0.1. During
this reporting month, weekly environmental site audits were conducted for
Contracts no. HK/2009/01,
HK/2009/02, HY/2009/15, HK/2010/06, HY/2009/19 and HK/2012/08. No
non-conformance was identified during the site audits.
8.0.2. Four site
inspections for Contract no. HK/2009/01 was carried out on 3, 10, 18 and 24 April
2013 in reporting month. Results of these inspections and outcomes are
summarized in Table 8.1.
Table 8.1 Summary
of Environmental Inspections for Contract no. HK/2009/01
Item |
Date |
Observations |
Action taken by
Contractor |
Outcome |
130403_01 |
3-Apr-13 |
Drip
tray should be properly maintained and preventing from leakage of water or
oil.(West Ferry Pier) |
Drip
tray were properly provided. |
Completion
as observed on 10 April 13 |
130410_01 |
10-Apr-13 |
The
entent of filled material above water mark was observed which affect the
water circulation of the HKCEC3E and water channel under HKCEC.
Measures and mitigation should be provided to improve the water
circulation to water intake |
Contractor
had no futher filling since 13 April 2013 |
Completion
as observed on 18 April 13 |
130418_01 |
18-Apr-13 |
Stockpile
should be covered to prevent flushing into the sea (Water Channel) |
Stockpile
was covered |
Completion
as observed on 24 April 13 |
130418_02 |
18-Apr-13 |
Silt
curtain should be properly maintainedto prevent flowing out of muddy water
(Expo drive East) |
Silt
curtain was properly deployed |
Completion
as observed on 24 April 13 |
130424_01 |
24-Apr-13 |
Equipment
should be preventing from spillage oil on the ground(A2-2) |
Spillage
was prevented |
Completion
as observed on 2 May 13 |
8.0.3. Five site
inspections for Contract no. HK/2009/02 was carried out on 28 March 2013, 5, 11,17
and 25 April 2013 during this reporting period. The
results of these inspections and outcomes are summarized in Table
8.2.
Table 8.2 Summary
of Environmental Inspections for Contract no. HK/2009/02
Item |
Date |
Observations |
Action taken by
Contractor |
Outcome |
130328_01 |
28-Mar-13 |
Silt
curtain should be properly deployed |
Silt
curtain was properly deployed . |
Completion
as observed on 5 April 2013 |
130417_01 |
17-Apr-2013 |
Muddy
water from pipe pilling should be collected and treated. The muddy water
should be prevent from getting into the hual road(New Ferry Pier) |
Muddy
water was not observed on hual road. |
Completion
as observed on 25 April 2013 |
8.0.4.
Four site inspections for Contract no.
HY/2009/15 was carried out on 2, 9, 16 and 23 April 2013 in reporting month.
The results of these inspections and outcomes are summarized in Table
8.3.
Table 8.3 Summary
of Environmental Inspections for Contract no. HY/2009/15
Date |
Observations |
Action taken by
Contractor |
Outcome |
|
130402_01 |
2-Apr-13 |
Silt curtain deployed
for dredging work area and around derrick barge should be tightened to avoid
gap (Eastern Breakwater) |
Silt curtain
enclosures were tightened |
Completion as
observed on 9 April 2013 |
130402_02 |
2-Apr-13 |
Mud resting at the
edge of the seawall block should be cleared (TS2) |
Mud residue was
cleared |
Completion as
observed on 9 April 2013 |
130409_01 |
9-Apr-13 |
Provision of drip
tray to oil storage (TS4) |
Drip tray was
provided |
Completion as
observed on 16 April
2013 |
130409_02 |
9-Apr-13 |
Oil stain should be
cleaned up |
Oil stain found was
removed |
Completion as
observed on 16 April
2013 |
130416_01 |
16-Apr-13 |
Perimeter drainage
channel should be cleared more regularly to keep clear of mud slurry to
maintain adequate flow and to prevent overflow (TS2) |
Partial clearing of
perimeter channel was provided |
Completion as
observed on 23 April 2013 |
130416_02 |
16-Apr-13 |
Suspended floc were
observed at wastewater treatment outfall location and in wastewater treatment
tank. Wastewater treatment process and procedure should be reviewed to
prevent improper discharge (TS2) |
Treatment process was
reviewed and adjusted, no further suspended floc was discharged |
Completion as
observed on 23 April 2013 |
130416_03 |
16-Apr-13 |
Silt curtain should
be provided around derrick barge in active operation conducting dredging
works (Eastern Breakwater) |
Additional silt
curtain was provided at the concerned area. |
Completion as
observed on 23 April 2013 |
130423_02 |
23-Apr-13 |
Drip tray should be
provided to oil buckets (TS4) |
Oil buckets were
removed. |
Completion as
observed on 30 April 2013 |
130423_03 |
23-Apr-13 |
Mud residue resting
at the edge of seawall near mud pit should be cleared to prevent drop-off to
nearby water (TS2) |
Mud residue was
cleared |
Completion as
observed on 7 May 2013. |
8.0.5. Five site
inspections for Contract no. HK/2010/06 was carried out on 2, 8, 18 and 22 and
29 April 2013 in reporting month. The results of these inspections and outcomes
are summarized in Table 8.4.
Table
8.4 Summary of
Environmental Inspections for Contract no. HK/2010/06
Item |
Date |
Observations |
Action taken by
Contractor |
Outcome |
130418_01 |
18-Apr-13 |
Chemical container should
be properly stored or clean up as chemical waste( Portion 2) |
Chemical container
have been removed |
Completion as
observed on 22 April 13 |
130418_02 |
18-Apr-13 |
C&D waste should
be properly clean and should not place near the retained tree (Children Playground) |
C&D waste have
been removed |
Completion as
observed on 22 April 13 |
8.0.6. Four site
inspections for Contract no. HY/2009/19 was carried out on 3, 10, 17 and 24 April 2013 in reporting month. No
observation is found in the reporting month
8.0.7. Four site
inspections for Contract no. HK/2012/08 was carried out on 2, 9, 16 and 23 April
2013 in this reporting period. No observation is found in the reporting month.
9.0.1. No
environmental complaint was received in the reporting period.
9.0.2.
The details of cumulative complaint log and updated summary of
complaints are presented in Appendix
9.1
9.0.3. Cumulative
statistic on complaints and successful prosecutions are summarized in Table
9.1 and Table 9.2 respectively.
Table
9.1 Cumulative Statistics on Complaints
Reporting Period |
No. of Complaints |
Commencement works (Mar 2010) to last
reporting month |
28 |
April 2013 |
0 |
Project-to-Date |
28 |
Table
9.2 Cumulative Statistics on Successful
Prosecutions
Environmental Parameters |
Cumulative No. Brought Forward |
No. of Successful Prosecutions this month (Offence Date) |
Cumulative No. Project-to-Date |
Air |
- |
0 |
0 |
Noise |
- |
0 |
0 |
Water |
- |
0 |
0 |
Waste |
- |
0 |
0 |
Total |
- |
0 |
0 |
10.0.1. The
EM&A programme was carried out in accordance with the EM&A Manual
requirements, minor alterations to the programme proposed were made in response
to changing circumstances.
10.0.2.
WDII/RSS advised that the dredging works for submarine pipeline at
10.0.3.
As the land-based piling and filling works- DP3 at Tin Hau had been
completed on 3 September 2012 and confirmed by RSS, the real-time noise
monitoring results at FEHD Hong Kong Transport Section Whitfield Depot was
excluded under EP-356/2009 since 28 November 2012.
10.0.4.
The real-time noise monitoring at RTN2-Oil Street Community
Liaison Centre has been relocated to City Garden Electric Centre (RTN2a-
Electric Centre) on 5 Oct 2012, which is a representative of noise sensitive
10.0.5.
Water quality monitoring at WSD10 and WSD15 will be temporary suspended
while water quality monitoring at WSD9 and WSD17 were implemented with respect
to HK/2009/02 for the water quality monitoring scheduled on 8 Feb 12 onwards;
10.0.6.
Due to the marine piling under Contract no. HY/2009/19 was completed on
4 March 2013, the temporary suspension of impact water quality monitoring at C8
and C9 from 4 March 2013 have been monitored for 4-week period after the
completion of marine works to confirm no water deterioration.
10.0.7. Water
quality monitoring at C8 & C9 was temporary suspended on 30 March 2013 due
to the marine works for Contract no. HY/2009/19 had been completed on 4 March
2013, and conclude if any water deterioration had been identified during the
4-week water quality monitoring.
10.0.8.
Based on the safety concern when external façade refurbishment was
conducted by contractor employed by Provident Centre (C9) between 9 January
2012 to 30 July 2012 which caused to the inaccessibility of sampling either
land and marine since 3 Feb 2012, there is a fine adjustment of the sampling
location of water quality monitoring at C9 since 10 March 2012 to the closest
accessible point prior to the completion of the external façade refurbishment
work.
10.0.9.
Due to the access of water monitoring station at WSD19 was blocked by
LCSD construction works from 3 April 2012 to 2 May 2012 and lead to the
inaccessibility of sampling either land and marine, there is a fine adjustment
of the sampling point of WSD 19 since 5 April 2012 to the closest accessible
point prior to the completion of the construction activities.
10.0.10. With respect to the trial dredging at WCR2 was scheduled on
20, 22, 24, 25 March and 1, 3, 11, 13, 15, 17, 19, 20 Apr and 3 May 2012, on-going water quality monitoring results at WSD21
during this period was checked and indicated that there was no contribution due
to the trial dredging operation. Enhanced review of water quality around
WCR2 was also implemented and no deterioration in the water quality was
observed.
10.0.11. Due to the dredging works for Cross Harbour Water Mains from
Wan Chai to Tsim Sha Tsui- DP6 was completed on 26 March 2012, the temporary
suspension of impact water quality monitoring at WSD7 and WSD20 after 27 April
2012 for the water quality monitoring at WSD7 and WSD20 have been monitored for
4-week period after the completion of DP6 to confirm no water deterioration.
10.0.12. The
scheduled construction activities and the recommended mitigation measures for
the coming month are listed in Table 10.1.
Table 10.1 Construction
Activities and Recommended Mitigation Measures in
Coming Reporting Month
Contract No. |
Key Construction Works |
Recommended Mitigation Measures |
HK/2009/01 |
Marine Works ¡P
Filling works up to +4.0mPD. ¡P
Steel bridge construction over temporary open
channel between CH220 and CH260. ¡P
Construction of mass concrete coping for new
seawall. ¡P
Installation of ELS for construction of proposed
box culvert Bay 8 and Bay 9. Subsequent Box Culvert construction for Bay 8
& 9. ¡P
Backfilling to temporary water channel for
subsequent demolition of promenade deck and pumping station at HKCEC Water
Channel. ¡P
Connection works of Pipeline D to exiting mains
at Wan Chai. ¡P
Connection works of Pipeline C to exiting mains
at Wan Chai. Fresh Watermains, Cooling
Watermains and Salt Watermains (On Land) ¡P
Works at Zone B6-1B, B6-2A, B6-4, B6-5B, A2-3A,
A1-5C, A3-3C, C1-2 and X2-1. ¡P
Mainlaying works at Zone A2-3A and A1-5C. ¡P
Mainlaying works in Zone C1-2. ¡P
Mainlaying works for proposed sewerage system in
Zone B6-1B, B6-2A, B6-4. ¡P
Mainlaying works at Zone X2-1. Tunnel Works ¡P
Installation of pre-bored H-pile in CWB Stage 1B
under the atrium link (from Ch80 to Ch220). ¡P
Installation of pre-bored H-pile in CWB Stage 1B
under the atrium link (from Ch120 to Ch220). ¡P
3rd Piling rig for pre-bored H piling works under
atrium would be mobilized to Site. ¡P
CWB diaphragm wall construction under the atrium
lin. ¡P
Construction of bulkhead Wall at Ch120. ¡P
Pre-drilling works for CWB (Stage 3). ¡P
Demolition of the promenade deck and pumping
stations at HKCEC Water Channel. E&M Works ¡P
Full commissioning for Cooling Water Pumping
Station P5. ¡P
Handover inspection for Cooling Water Pumping
Station P3. ¡P
Handover inspection for Cooling Water Pumping
Station P5. Application of Epoxy
Lining to Existing Box Culvert M (VO No.31) ¡P
Epoxy lining application to the western box of
the existing Box Culvert M. |
¡P
To conform the installation and setting as in
the silt screen deployment plan ¡P
Frequency spray water on the dry dusty road
and on the surface of concrete breaking ¡P
To cover the dusty material or stockpile by
impervious sheet ¡P
To space out noisy
equipment and position as far as possible from sensitive receiver. ¡P
To well maintain
the mechanical equipments / machineries to avoid abnormal noise nuisance. ¡P
Machines and plant
that may be in intermittent use should be shut down between work periods or
should be throttled down to a minimum ¡P
Daily visual inspection of silt screen and
silt curtain to ensure its operation properly |
HK/2009/02 |
¡P
Footpath reinstatement works of cooling mains
near Harbour Centre / Great Eagle Centre. ¡P
Remedial works and subsequent T&C for CRB
intake pipes within WCR1 area. Notification to stakeholder for switching over
for the proposed cooling water intake system. ¡P
Construction of pile caps for rectifying the
subsided intake pipes for both GE/HC and SHK. ¡P
Remaining DN800 salt watermins (CHS ¡P
Construction of remedial works for the concrete
plug at Bay 1B and the subsequent construction of Bay 1B and Bay 2B Intake Culvert. ¡P
All mainlaying works and prepare for connection
with the existing DN600 salt watermains at ¡P
Leakage test for the installed stoplog at Bay ¡P
Synthetic woods and façade works for the external
wall of WSD Salt Water Pumping Station. ¡P
Backfilling to Bay 6 to Bay 11 of Intake Culvert. ¡P
PLC & SCADA functional and performance tests
after completion of training to WSD staff. ¡P
Reinstatement works of DSD receiving pit at ¡P
Construction of Bay 4 & Bay 5 of the proposed
Box Culvert N1. ¡P
ABWF in Ferry Pier. ¡P
Installation of moveable ramp system included the
commencement of ramp installation ¡P
Civil works above the caisson seawall 2X
including staircase ST-1 and the plant room underneath the western staircase. ¡P
Late cast portion for Roof RC Superstructure
above the machine room in Level M. ¡P
Lift installation at Ferry Pier. |
¡P
To cover the dusty material or stockpile by
impervious sheet; ¡P
Frequency spray water on the dry dusty road
and on the surface of concrete breaking ¡P
To well maintain the mechanical equipments /
machineries to avoid abnormal noise nuisance and dark smoke emission ¡P
To conform the installation and setting as in
the silt screen and silt curtain deployment
plan ¡P
Movable noise
barrier shall be deployed for demolition works ¡P
Daily visual inspection of silt screen and
silt curtain to ensure its operation properly ¡P
Review silt screen
deployment and silt curtain deployment and resubmit associate
plans to EPD ¡P
Implement silt
screen and silt curtain in accordance with the associated plans submitted to
EPD. |
HY/2009/15 |
¡P
Removal of eastern breakwater of CBTS ¡P
Installation of temporary wave protection barrier
at eastern breakwater ¡P
Temporary works for EVA |
¡P
Daily visual inspection of silt screen and
silt curtain to ensure its operation properly ¡P
Implement silt
screen and silt curtain in accordance with the associated plans submitted to
EPD. |
HK/2010/06 |
¡P
Sheet Piling Works ¡P
Utility Diversion Works ¡P
Road surfacing works ¡P
Precast Unit Box Installation Preparation Works
(mainland |
¡P
To conform the installation and setting as in
the silt screen and silt curtain
deployment plan ¡P
To space out noisy
equipment and position as far as possible from sensitive receiver. ¡P
Daily visual inspection of silt screen and
silt curtain to ensure its operation properly |
HY/2009/19 |
¡P
Bored piling (Land) ¡P
D-wall and Barrette Construction ¡P
Construction works for Box Culvert T1 ¡P
Construction works for Culvert U1 ¡P
Construction of Pile cap (Land) ¡P
Demolition of parapet at IEC Link ¡P
Construction of dewatering well for Cut &
Cover Tunnel ¡P
Construction of pile cap, column & cross head
(Marine) ¡P
D8-D9 Gantry Fabrication for precast segment ¡P
ELS for Cut & Cover Tunnel ¡P
Laying of 1500f pipe |
¡P
To conform the installation and setting as in
the silt screen and silt curtain deployment plan |
HK/2012/08 |
¡P
Hoarding erection ¡P
Marine GI |
¡P
To conform the installation and setting as in
the silt screen and silt curtain deployment plan |